
This sets the period in minutes over which the current and power readings are integrated
for maximum demand measurement. The options are: 0, 5, 8,10,15, 20, 30, 60 minutes.
4.4 DIT Demand Integration Time
4.3.1 Pulse Rate
Use this to set the energy represented by each pulse. Rate can be set to 1 pulse per
0.01kWh / 0.1kWh / 1kWh / 10kWh / 100kWh.
4.3.2 Pulse Duration
The pulse width can be selected as 200, 100 (default) or 60ms.
(It shows 1 impulse = 10kWh/kVArh)
From the set-up menu, use and buttons to select the Pulse
Rate option.
MD/
PF/HZ
P
Press to enter the selection routine. The current setting will flash.
0.01/0.1/1/10/100kWh/kVArh per pulse.
Use and buttons to choose pulse rate. On completion of the
entry procedure, press to confirm the setting and press to
return to the main set up menu.
V/A
ESC
MD/
PF/HZ
P
E
E
From the set-up menu, use and buttons to select the DIT
option. The screen will show the currently selected integration time.
Press to enter the selection routine. The current time interval will
flash.
Use and buttons to select the time required.
Press to confirm the selection. SET indicator will appear.
Press to exit the DIT selection routine and return to the menu.
V/A
ESC
MD/
PF/HZ
P
MD/
PF/HZ
P
E
E
(It shows pulse width of 200ms)
From the set-up menu, use and buttons to select the Pulse width
option.
Press to enter the selection routine. The current setting will flash.
Use and buttons to choose pulse rate. On completion of the
entry procedure, press to confirm the setting and press to
return to the main set up menu.
V/A
ESC
MD/
PF/HZ
P
MD/
PF/HZ
P
E
E
www.autometers.co.uk
8