Mechanical Installation
Ensure gate rolls easily and has been installed in a manner where there is no excessive friction or
binding occurring.
A concrete base approximately 600mm long x 300 wide x 300mm deep should be laid where the gate
operator is to be located.
IMPORTANT
ensure there are gate stops firmly installed in the fully open and closed positions. These
stops need to be engineered and installed such that they will be strong enough to stop the gate should the
limits fail at any time.
Remove the gate operator cover and position mounting plate and operator in approximate mounting
location.
Use the rack to locate the operator the correct distance away from the gate rail (finer adjustment can be
made after).
Dynabolt or chemical anchor the bottom mounting plate to the concrete mounting pad using 12 x
100mm fixings.
Unscrew anticlockwise the manual disconnect knurled knob so the drive gear free wheels.
Fix the rack to the gate rail ensuring there is approximately 1mm - 2mm gap between the meshing of the
teeth of the rack and the drive gear (no more). Move the gate by hand from one end to the other while
checking that the rack is meshing correctly with the drive gear on the operator. Check also that the rack
is centred around the middle of the teeth on the drive cog
–
tighten the mounting plate nuts.