background image

TJ250       

   04 

Operation 

The owner and/ or operator shall 
have an understanding of the 
product, its operating characteristics 
and safety operating instructions 
before operating this device.

Safety information shall be 
emphasized and understood. If the 
operator is not fluent in English, the 
product and safety instructions shall 
be read to and discussed with the 
operator in the operator’s native 
language by the purchaser/owner or 
his designee, making sure that the 
operator comprehends their contents. 

Inspection 

a. Visual inspection shall be made 

before each use of the jack by 
checking for abnormal 
conditions, such as cracked 
welds, leaks, and damaged, 
loose, or missing parts.

b. Other inspections shall be made 

as per product operating 
instructions.

c. This jack should be inspected 

immediately if the jack is 
believed to have been subject to 
an abnormal load or shock. It is 
recommended that this 
inspection be made by a 
manufacturer’s or supplier’s 
authorised repair facility.

d.  Owners and/or operators should be

made aware that the repair of this 
equipment may require specialised 
knowledge and facilities. It is 
recommended that an annual 
inspection of the product be made 
by a manufacturer’s or supplier’s 
authorised repair facility and that 
any defective parts, safety labels or 
signs be replaced with 
manufacturers or supplier’s specified 
parts.

Damaged Equipment 

Any jack that appears to be damaged 
in any way, is found to be worn, or 
operates abnormally 

must be 

removed from service until repaired.

  

It is recommended that necessary 
repairs are to be made by a 
manufacturer’s or supplier’s authorised 
repair facility, if repairs are permitted by 
the manufacturer or supplier. 

Alterations 

Due to the potential hazards 
associated with this type of equipment, 
no alterations shall be made to the 
product. 

Attachments & Adapters. 

Only attachments and/or adapters 
supplied by the manufacturer shall be 
used. 

Содержание TJ250

Страница 1: ...SAFETY AND OPERATING MANUAL TROLLEY JACK TJ250 TJ250 ORIGINAL INSTRUCTIONS Made in China 160120 Version 1...

Страница 2: ...TJ250 TABLE OF CONTENTS Safety Precautions 01 Machine Details 03 Operation 04 Maintenance 06 Troubleshooting 07 Declaration of Conformity 09 Parts list 10 Parts Diagram 11...

Страница 3: ...elated materials Use the jack on level and solid ground preferably concrete Avoid tarmacadam as jack may sink in Place wedges under the wheels of vehicle but ensure the jack wheels are free to move an...

Страница 4: ...mmended that the effort be reduced by the use of assistance during this operation DO NOT adjust the safety overload valve DO NOT jack vehicle if there is a risk of spillage of fuel battery acid or oth...

Страница 5: ...ight 80mm Max Saddle height 515mm Length 722mm Weight 34 1KG Product Features 8 9 7 6 5 4 3 2 1 load 360 515mm 1 Bottom floor jack pump handle 2 Pump handle socket 3 Floor Jack frame 4 Pump handle hex...

Страница 6: ...load or shock It is recommended that this inspection be made by a manufacturer s or supplier s authorised repair facility d Owners and or operators should be made aware that the repair of this equipme...

Страница 7: ...to determine the location of the jack points d Be sure to set the vehicle in park with the emergency brake on and wheels secured and checked e Be sure that the vehicle and the jack are on a hard level...

Страница 8: ...il filler plug Then replace the unit cover Lubrication and cleaning Periodically clean and lubricate all moving parts and pivot points Air Venting Procedures 1 With the jack in the fully lowered posit...

Страница 9: ...d re try 5 Clean and replace oil 6 Replace packing Jack does not lift high enough or feels Spongy 1 Oil level too high or too low 2 Worn seals 3 Air in system 4 Release valve not closed 1 Fill or remo...

Страница 10: ...l service agent 5 Replace packing Jack will not lower completely 1 Unit requires lubrication 2 Piston rod bent or damaged 3 Jack frame link system distorted due to overloading poor positioning 4 Air i...

Страница 11: ...TJ250 09...

Страница 12: ...sher M16 2 19 GB859 16 Spring washer M16 4 20 GB6170 M16 Nut M16 4 21 T83508 6 ASM Rear caster assembly 2 22 Spring washer M12 4 23 Socket head cap screw M12X25mm 2 24 Back shaft 1 25 Nut M12 2 26 Han...

Страница 13: ...EP82 3 09 TJ250 11 PARTS DIAGRAM...

Отзывы: