Installation guidance
Preparation
The main unit should be installed
in the center of roof, it is
recommended to have a min
100mm space around the top
unit
Before installing please verify
there is suitable space in the
ceiling to accept the plenum
The
installation
position
(400x400mm)
should
avoid
skylight, solar panels, roof vents,
heaters, lights and all electrical
connections
Содержание K3600-50
Страница 3: ...Introduction ...