Operation Instruction
Operation Instruction
Specification Parameters
Product Maintenance
Product maintenance
Filter
The return air filters are the only components needing to be maintained
periodically.
Check and clean the filters each week when in use.
Remove filters from the plenum and wash in warm water with a touch
of detergent.
Screw check
It is recommended that the bolts holding the unit to the roof are
checked for tightness 3 months after the first installation of the product.
These bolts should be regularly inspected a minimum of every 12
months through- out the air conditioners life.
Maintenance
It is recommended that the air-conditioner is operated regularly to
ensure good performance.
In the case of a caravan that will not be used regularly then the unit
should be operated for 20-30 minutes every 6 months.
In the event the caravan is parked outdoors for an extended period it
is recommended a protective jacket be fitted over the main unit of the
air conditioner to protect from the elements.
Содержание K3600-50
Страница 3: ...Introduction ...