installation
and
user
manual
aurora
suspended
fires
15
14
installation
3
SUSPENSION BRACKET
INSTALLATION OVERVIEW
FLAT CEILING INSTALLATION
· ·
·
The bracket must be structurally secured within the roof as
shown in the diagram
· ·
·
The largest cylinder must protrude down from the ceiling by
at least 1͈ unless the ceiling is made from a non-combustible
material such as concrete.
· ·
·
You must leave a 1͈ clearance gap between the bracket and the
ceiling. This gap will be covered by the ceiling cover plate.
· ·
·
1/2͈ ventilation gap between the plasterboard and the ceiling
cover plate.
· ·
·
1/2͈ minimum clearance from the insulated flue to any
combustible material within the roof space.
1. Choose the position of firebox and flue ensuring that you follow
the clearances described within this section
2. Install the suspension bracket
3. Install the internal lower flue
4. Install the flue connector
5. Install the external insulated flue & anti-down draught cowl
6. Engage the firebox
7. Ensure the floor has adequate protection
»
CEILING
CEILING COVER
PLATE
1
̎
MINIMUM
BELOW CEILING
1
̎
MINIMUM
CLEARANCE