6
RWA Control Unit
LSF 7000
n
ote
All components of the system must be
freely accessible
at all times during
their entire service life for maintenance
and repair work!
When correctly assembling system components, attaching
them to components by the customer or connecting them
to Control Units, the interfaces resulting from the mecha-
nical and electrical performance features of the individual
elements must be observed.
!
c
Aution
Before working on the system, it must be
completely disconnected from the mains po-
wer supply and the emergency power supply
(e.g. batteries) and secured against uninten-
tional reconnection. When working in the
Control Unit, the workstation must be secured
against unauthorised access. It must be ensu-
red that unauthorised persons are unable to
open the Control Unit.
!
W
Arning
!
W
Arning
All functions of the system must be
carefully checked before releasing for
operation.
The assembly instructions of the system components (smoke
detector, NRWG, drives, etc.) are part of the documentation
of the whole system and, like the installation and operating
instructions of the Control Unit, must be kept accessible to
authorised specialists for the lifetime of the system.
The information in the assembly in-
structions of the individual components
must be observed and adhered to!
Incorect installation can lead to serious
injuries!
Other persons must be kept away from
moving parts of the installation if a mo-
vable part is closing, such as a window
sash which has been opened by a smoke
and heat exhaustion system!
Software terms & conditions
The Control Unit is configured at the factory for its intended
use (standard configuration). The software, specially de-
veloped for this Control Unit, allows quick and easy adjust-
ment of the factory settings to the respective requirements.
In addition, the system status can be saved, recalled and
printed out.
Changeable standard configurations are high-
lighted in these instructions. The Software is
included in the delivery of the Control Unit.
The functional range of this licence-free
version can be extended by a fee-based
licence activation.
USB
s
afety
i
nstruCtions
01
The system requirements (see chapter „S
ystem
C
onfiguration
via
s
oftware
“) must be checked before the installation. The
„software clause for the provision of standard software as
part of the delivery“ of the ZVEI (Central Association of the
Electrical Engineering and Electronics Industry) is conside-
red to be legally binding upon installation.
See our homepage:
a
umüLLer
a
umatic
GmbH
(www.aumueller-gmbh.de)
Therefore, we recommend the operating system and the
software of the system to be adequately protected against
unauthorised access (e.g. by password) and that training be
attended by the manufacturer.
The configuration software of the Control Unit
largely excludes damage caused by incorrect
settings. As a precautionary measure, we
would like to point out that
a
umüLLer
, as a
manufacturer, cannot assume liability for da-
mages resulting from the use of the configu-
ration software, because
a
umüLLer
itself has
no influence on a perfect system environment
or object-specific system configuration.
USB
Commissioning, operation and maintenance
After the installation and after every change in the structure
/ layout, all functions must be checked by a test run. After
completion of the system the end user must be instructed
on all important operating steps. If necessary, they must be
advised of any remaining risks or dangers. The end user is to
clarify the intended use of the system and, if applicable, the
safety instructions.
n
ote
Post warning signs!
Содержание Lift-Smoke-Free LSF 7000
Страница 54: ...54 RWA Control Unit LSF7000 Notes 08 ...
Страница 56: ...9000032001_V0 6_KW50 2021 ...