6.5.2.
Cable connection
Table 23:
Terminal cross sections and terminal tightening torques
Tightening torques
Terminal cross sections
Designation
1.5 – 1.8 Nm
max. 10 mm² (flexible or solid)
Power contacts (U, V, W)
3.0 – 4.0 Nm
max. 10 mm² (flexible or solid)
PE connection
0.6 – 0.8 Nm
max. 2.5 mm² flexible, or
max. 4 mm² solid
Control contacts (1 to 50)
1.
Remove cable sheathing and insert the wires into the cable glands.
2.
Fasten cable glands with the specified torque to ensure required enclosure
protection.
Information: For shielded cables: Link the cable shield end via the cable gland
to the housing (earthing).
3.
Strip wires.
4.
For flexible cables: Use end sleeves according to DIN 46228.
5.
Connect cables according to order-related wiring diagram.
In case of a fault: Hazardous voltage while protective earth conductor is NOT
connected!
Risk of electric shock.
→
Connect all protective earth conductors.
→
Connect PE connection to external protective earth conductor of connecting
cables.
→
Start running the device only after having connected the protective earth con-
ductor.
6.
Firmly tighten protective earth to PE connection (symbol:
).
Figure 37: Protective earth (PE)
[1]
U-bracket for PE connection
41
SAEx 07.2 – SAEx 16.2/SAREx 07.2 – SAREx 16.2 Control unit: electronic (MWG)
ACExC 01.2 Non-Intrusive HART
Electrical connection