background image

WASTEWATER TREATMENT 

PLANT MODEL AT6 - AT50

3

4

• RULES FOR THE INSTALLATION OF THE UNIT 

Caring for nature

When buying the Unit, you help fight environmental and water pollution. Every installed and 
functioning Unit contributes to reducing the amount of dirty water released into the environ

-

ment. The water obtained after the treatment of wastewater in the Unit can be discharged into 
the ground or water bodies without affecting the ecological system. Therefore, with our built-in 
wastewater treatment technology, you can rest assured about the ecology and the world will be 
grateful for your environmentally-friendly Unit. 
1. Selection of installation location:
1.1. Location for installation of the Unit must be selected so that the treated water can flow 
automatically (see Principal diagram 1).

IMPORTANT! If the Unit is not mounted on reinforced concrete rings, it may not be installed on 

the part of the plot of land intended for transport traffic and/or parking, as well as on the part 
of the land where storm water or high groundwater accumulates.
1.2. The Unit must be easily accessible for frequent inspections.

1.3. It is necessary to maintain the distance from adjacent objects established by the applicable 

legal regulations.

The Unit and the systems ensuring its functionality must be installed in accordance with the 
requirements of the effective legal regulations, the technical or work project of the building, 
instructions for installation work and these recommendations.
2. Preparation for construction: 
2.1. The wastewater pipe from the source to the Unit must be laid with a slope suitable for 
gravity flow of wastewater.

2.2. 

IMPORTANT!

 Burying the pipe for the discharge of wastewater to the Unit may not exceed 

1 m from the ground surface, which must be taken into account in advance in the formation of 
the terrain. For pipes buried 1 m and more, the sewage lifting pump station must be installed 

upstream of the Unit.

2.3. The diameters of the wastewater effluent and treated water pipes MUST correspond to the 

diameter of the built-in couplings in the Unit.

The depth of the wastewater pipe must match the depth of the Unit coupling.
2.4. The pit for the convenient installation of the Unit must be at least 1.5 m wider than the diame

-

ter of the Unit. The installation site should be cleaned of debris and be free of vegetation (trees), 
the roots of which may interfere with the installation and subsequent operation of the Unit.

Principal diagram 1

example

Содержание AT-10

Страница 1: ...WASTEWATER TREATMENT PLANT MODEL AT6 AT50 WASTEWATER TREATMENT PLANT TECHNICAL PASS AT SYSTEM SOLUTIONS FOR HUMAN AND NATURE e x a m p l e ...

Страница 2: ... BDS5 0 35 kg d BDS5 SM ChDS NH4 N N 98 2 7 0mg l 97 2 12 0mg l 94 4 45 0mg l 99 5 0 2mg l 93 2 5 6mg l 93 3 0 6mg l Performance of the Unit Daily load of organic pollutants BOD5 Hydraulic daily load Tightness water test Crushing resistance Durability kg d m3 d pass pass pass Buyer s address The WWTP P P tank is covered by a 10 ten year warranty from Electrical part blower controller 2 two year wa...

Страница 3: ... TECHNICAL DATA OF THE UNIT TREATMENT PROCESS MECHANICAL AND ELECTRICAL DEVICES AUGUST BASIC CONTROLLER CONTROL AND MAINTENANCE MANUAL REMOVAL OF SURPLUS SLUDGE UNIT MAINTENANCE MANUAL CERTIFICATE DECLARATION OF PERFORMANCE COMMENTS AND NOTES 1 3 4 7 8 9 9 11 13 15 16 19 20 21 2 WASTEWATER TREATMENT PLANT MODEL AT6 AT50 e x a m p l e ...

Страница 4: ...ontaminants in the wastewater thus purifying the water In addition to food vital bacterial activity also requires oxygen therefore a blower comprising an integral part of the Unit is installed next to the Unit housing All household chemicals detergents cleaning agents etc if used moderately are allowed and do not cause harmful effects on the Unit In order to avoid operational problems it should be...

Страница 5: ...essary to maintain the distance from adjacent objects established by the applicable legal regulations The Unit and the systems ensuring its functionality must be installed in accordance with the requirements of the effective legal regulations the technical or work project of the building instructions for installation work and these recommendations 2 Preparation for construction 2 1 The wastewater ...

Страница 6: ...he Units It is necessary to raise about 0 30 m of undisturbed soil to the groundwater level 3 6 The Unit is lowered into the pit using typical lifting mechanisms 3 7 After lowering the Unit into the pit and checking the design position depth horizontal vertical 3 2 IMPORTANT Pit depth depends on the depth of the wastewater pipe at the installation location The pit must have a funnel shape the diam...

Страница 7: ... The indoor mounted blower must not come into contact with the wall or any other building structure If the blower is installed outdoors it must be protected against moisture rain and dust A blower container should not be installed in a place where water can run on it and accumulate High quality gaskets MUST be used in openings 4 2 220V 3X1 5 mm electric cable is connected to the Unit 4 3 The dista...

Страница 8: ...tions of the Unit prepared by the Manufac turer which in each case is handed over to the Buyer together with the Unit and 4 4 The installation work of the Unit has been carried out by the Manufacturer or its authorised person or by a contractor having the necessary qualifications and the right to perform work for the construction of engineering networks or by the builder under the supervision of a...

Страница 9: ...he biological reactor Height of the inlet pipe Height of the outlet pipe Average el consumption programa STANDART Diameter Heigh mm mm mm mm kWh AT 6 1400 1800 1300 1150 0 72 AT 8 1400 2200 1700 1500 0 72 AT 9 1470 2200 1800 1600 0 72 AT 10 1600 2200 1700 1500 0 95 AT 12 1750 2200 1700 1500 1 37 AT 15 2050 2200 1700 1500 1 71 AT 20 2050 2700 2200 2000 2 07 AT 30 2300 3000 2500 2300 2 16 AT 40 2850...

Страница 10: ...ids bag and must be removed later The solids bag is lifted by pulling the handle and cleaned Air distribution panel and adjustment valves A valve Controls air volume to airlift 1 internal recirculation Large bubbles mix the contents of section 1a whirling should be visible on the water surface The valve is partially opened B valve Controls air flow to the current regulator 3 Normally it is set to ...

Страница 11: ...l production control If necessary you can set new settings but first you have to close all the valves and then follow the instructions above Flow controller The flow controller ensures flow balancing under high instantaneous loads bath wash basin etc The discharge of water from the biological wastewater treatment plant through the calibrated hole in the flow regulator is 3 l min 180 l h Blower The...

Страница 12: ...enu is OPERATING MODE SELECT By a next pressing SET we enter into the selection of programs there we can move with Δ If we want to select a program select by Δ and then confirm it with SET Programs The microprocessor control unit AUGUST has the pre set standard mode in which it is ready to control the operation of the plant without other settings The display shows date and time and program STANDAR...

Страница 13: ...g from the holiday it is enough to click Δ and the microprocessor switches automatically to the pre set standard program program WEEKEND HOUSE this was designed for treatment of waste water from weekend houses with occupation on weekends or once in a month Before leaving such an object program WEEKEND HOUSE is set After returning it is enough to click Δ and the microprocessor returns automatically...

Страница 14: ...tion of the blower OPERATION AND MAINTENANCE INSTRUCTIONS Launching the Unit Setting the BASIC controller Connecting the blower Adjusting the air distribution manifold valves Filling activated sludge 0 25 m3 4 m3 depending on sewage treatment plant model and sludge concentration Unit shutdown The Unit is turned off upon disconnecting the controller Make sure to pump out the contents of the Unit wa...

Страница 15: ...ges There are two types of alarm in the controller acoustic and optical The optical alarm system operates continuously The audible alarm will be triggered if the blower or controller is malfunc tioning or in case of power failure The audible alarm can be interrupted by pressing Δ Optical alarm Constant green blower operation is temporarily paused this is not a malfunction Flashing green blower ope...

Страница 16: ...d sludge mixture from the aerated chamber and transfer to the sedimentation test flask The sample is collected with the blower operating Allow the mixture to settle for 30 minutes After this period check the amount of settled sludge a clear difference between water and sludge should be visible This should be 300 600 ml of sludge 1 l of water most optimal 400 500 ml of sludge 1 l of water In such a...

Страница 17: ... evenly maintaining the water level difference between the chambers up to 15 cm The sludge concentration in the biological reactor of the Unit after removal must not be less than 300 ml l The pump pipe for pumping excess sludge must be placed carefully into the biological reactor of the Unit without damaging the aeration elements or other internal equipment The maintenance manual is part of the te...

Страница 18: ...t are pathogenic to humans and there fore when working with the Unit make sure to protect yourself Wear clothing with long sleeves and long trousers to avoid skin contact with the household wastewater system Use rubber gloves It is forbidden to keep food or drinks near the sewage samples never store food and sewage samples in the same refrigerator Remove splashed or wet clothes as soon as possible...

Страница 19: ...WASTEWATER TREATMENT PLANT MODEL AT6 AT50 18 MAINTENANCE MANUAL OF WASTEWATER TREATMENT UNIT Date Visual inspection Completed tasks Sludge concentration ml l e x a m p l e ...

Страница 20: ...WASTEWATER TREATMENT PLANT MODEL AT6 AT50 19 CERTIFICATE e x a m p l e ...

Страница 21: ...WASTEWATER TREATMENT PLANT MODEL AT6 AT50 20 e x a m p l e ...

Страница 22: ...WASTEWATER TREATMENT PLANT MODEL AT6 AT50 21 COMMENTS AND NOTES e x a m p l e ...

Страница 23: ...WASTEWATER TREATMENT PLANT MODEL AT6 AT50 22 COMMENTS AND NOTES e x a m p l e ...

Страница 24: ... AUGUST IR KO JSC Juodasis kelias 104a LT 11307 Vilnius Lietuva 370 5 235 5083 info august lt www august lt e x a m p l e ...

Отзывы: