WASTEWATER TREATMENT
PLANT MODEL AT6 - AT50
3
4
• RULES FOR THE INSTALLATION OF THE UNIT
Caring for nature
When buying the Unit, you help fight environmental and water pollution. Every installed and
functioning Unit contributes to reducing the amount of dirty water released into the environ
-
ment. The water obtained after the treatment of wastewater in the Unit can be discharged into
the ground or water bodies without affecting the ecological system. Therefore, with our built-in
wastewater treatment technology, you can rest assured about the ecology and the world will be
grateful for your environmentally-friendly Unit.
1. Selection of installation location:
1.1. Location for installation of the Unit must be selected so that the treated water can flow
automatically (see Principal diagram 1).
IMPORTANT! If the Unit is not mounted on reinforced concrete rings, it may not be installed on
the part of the plot of land intended for transport traffic and/or parking, as well as on the part
of the land where storm water or high groundwater accumulates.
1.2. The Unit must be easily accessible for frequent inspections.
1.3. It is necessary to maintain the distance from adjacent objects established by the applicable
legal regulations.
The Unit and the systems ensuring its functionality must be installed in accordance with the
requirements of the effective legal regulations, the technical or work project of the building,
instructions for installation work and these recommendations.
2. Preparation for construction:
2.1. The wastewater pipe from the source to the Unit must be laid with a slope suitable for
gravity flow of wastewater.
2.2.
IMPORTANT!
Burying the pipe for the discharge of wastewater to the Unit may not exceed
1 m from the ground surface, which must be taken into account in advance in the formation of
the terrain. For pipes buried 1 m and more, the sewage lifting pump station must be installed
upstream of the Unit.
2.3. The diameters of the wastewater effluent and treated water pipes MUST correspond to the
diameter of the built-in couplings in the Unit.
The depth of the wastewater pipe must match the depth of the Unit coupling.
2.4. The pit for the convenient installation of the Unit must be at least 1.5 m wider than the diame
-
ter of the Unit. The installation site should be cleaned of debris and be free of vegetation (trees),
the roots of which may interfere with the installation and subsequent operation of the Unit.
Principal diagram 1
example
Содержание AT-10
Страница 20: ...WASTEWATER TREATMENT PLANT MODEL AT6 AT50 19 CERTIFICATE e x a m p l e ...
Страница 21: ...WASTEWATER TREATMENT PLANT MODEL AT6 AT50 20 e x a m p l e ...
Страница 22: ...WASTEWATER TREATMENT PLANT MODEL AT6 AT50 21 COMMENTS AND NOTES e x a m p l e ...
Страница 23: ...WASTEWATER TREATMENT PLANT MODEL AT6 AT50 22 COMMENTS AND NOTES e x a m p l e ...