![auer DS170 d Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/auer/ds170-d/ds170-d_installation-manual_3015802007.webp)
-
INSTALLATION
DS170 PILOT
MANUAL
-
7
2 -PLEASE READ
IMMEDIATELY
This technical installation manual forms part of the appliance which
it refers to. In order for the warranty to be valid, the instructions must
be read prior to using the appliance.
The safety advice and instructions provided in this manual must be
strictly respected.
Our society is not liable for any damages caused from not following
the instructions provided, or improper handling, installation or use.
This technical installation manual can be modifi ed without prior
notice.
This manual must be safeguarded and passed on to successive users
for future reference.
It will be considered as evidence in case of litigation.
2.1 - Conservation of documents
DHW ....... Domestic Hot Water
DCW ....... Domestic Cold Water
T° .............. Temperature
HP ............ Heat pump
2.3 - Abbreviations and acronyms
2.4- Delivery terms and conditions
In general, the material is transported at the recipient’s own risk.
It is important to ensure that all components have been received and
that no damage has been sustained during transport upon receipt
of the appliance, and before beginning the installation procedures
Admissible storage and transport temperatures are from -20°C to
+60°C.
The
Pilot
must be stored and transported on its pallet and in its
original packaging and empty of water.
2.5 - Storage and transport
2.8 - End of life of the appliance
Our products are designed and manufactured using
components made of recyclable materials.
The appliance must never, in any case, be disposed of
with household waste, or in a dump.
The dismantling and recycling of the appliances must
be taken charge of by a qualifi ed professional and in compliance
with all local and national standards in eff ect.
Indicates warnings and important recommendations.
2.2 - Symbols used
Contains regulated substances, do not throw in the
garbage. If disposing, please respect all regulations
pertaining to the recovery of electric and electronic
equipment.
Maximum working pressure.
PS max
Consult the installation manual before any intervention
on the product, before handling, installation, use , and
maintenance.
Heat power output produced.
Indicates the maximum water temperature in operation.
2.7 - Rating plate
Position de la plaque signalétique
Rating plate position
2.6 - Unpacking
On reception of the pilot, check the state
of the cardboard packaging as well as
the general state of the product. Remove
cardboard box by pulling it up.
The packaging cardboard of the pilot is
stapped to the pallet.
Only remove the straps when unpacking
the pilot.
Содержание DS170 d
Страница 6: ... INSTALLATION DS170 PILOT MANUAL 6 ...
Страница 34: ... INSTALLATION DS170 PILOT MANUAL 34 A1 3 Dimensions ...
Страница 37: ... INSTALLATION DS170 PILOT MANUAL 37 A3 Wiring diagrams ...