background image

 
 
Installing the DFS-120E: 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

(the shown model is inclusive the optional DFS-CP) 

 
1. 

The DFS-120E is the trolley version of the upper mentioned DWS system. 
Both systems have the same technical specifications. 

 
2. 

Remove the system from the packaging and check the content. 
Do not remove the transport bar from the product untill the product is completely 
assembled. 
Mount the colums on top of the wheel base.  
Be gentle with positioning so that the top of the wheel base does not get scratched. 
Use only the suplied M8 bolts to fasten the set.  
When the optional cover plate is applicable on the system, fasten is after fitting the 
columns. 
 
Fasten the bolts firmly, but to much. Fastening to tight may damage the windings. 
When installed the transport bar can be removed. 
 

3. 

Only use the system on level surfaces. 
Always lock the wheels when presenting with the system and  
changing the screen height. 
 
 
 
4. 
The adjustments of the system are equal to the upper mentioned DWS system. 
 
 

Содержание DFS-120E

Страница 1: ...Mounting user instruction DWS 120 E DWS 160E DFS 120E Copyright Audipack ...

Страница 2: ... drum see next page Proper fitting of the monitor cart between the 2 columns The system must be mounted to the wall inclusive the transport security aids This will help installing the system keeping the product steady and strong Transport security bar The top bar must be kept installed and may not be removed Only the bottom beam red in drawing can be removed afther proper installing It is possible...

Страница 3: ...f a proper installed cable on the motor drum The cable must be organised proper When not please shift the cable neatly all the way to the sides towards cable fastening With the DFS system the back cover must be removed first ...

Страница 4: ...s Be sure the wall is constructional capable of withstanding the forces of this system with flat panel It s the installers choice and responsibility to use correct fasteners Mounting point upper left Mountingppoint lower left 2 Install the system level in all directions An un level system may result in a faulty functioning and quick ware out of guidance The system must suppport on the floor and is...

Страница 5: ...d from top to bottom Remove the small lids from the columns and use a 13 mm wrench to correct the cable length Keep the stainless steel wire from rotating by holding it woth pliers left adjustment point 3 The cables of the flat panel etc can be organized in the special cable guidance Keep cables away from rotating parts DWS 120E only ...

Страница 6: ...use the UFPRO universal flat panel mounts In case of using the VESA pattern use the optional Audipack stainless steel cams for installing the flat panel directly to the system VESA 400 VESA 600 L S5 VESA 400 max load 120 Kg VESA 600 max load 120 Kg 160 Kg for the DWS 160E L S5 max load 85 Kg i c w UFPRO Available mounting cams M6 part no 392618 M8 part no 392318 M10 part no 390618 ...

Страница 7: ...5 Flat panel security If needed it is possible to secure the flat panel from taking it unauthorized away Unlock and slide the cover panel before inserting the flat panel Reinstall it afterwards ...

Страница 8: ...p of the wheel base Be gentle with positioning so that the top of the wheel base does not get scratched Use only the suplied M8 bolts to fasten the set When the optional cover plate is applicable on the system fasten is after fitting the columns Fasten the bolts firmly but to much Fastening to tight may damage the windings When installed the transport bar can be removed 3 Only use the system on le...

Страница 9: ...ting head colored knobs are visible With an alan key the positions can be set by adjusting their position Adjusting the upper limit White knob While giving command up adjust the white knob with an alan key Check left and right turning for adjusting the right direction Adjusting lower position Yellow knob While giving command up adjust the yellow knob with an alan key Check left and right turning f...

Страница 10: ...Connecting the DWS 160E Please consult the below listed diagram ...

Страница 11: ...he flightcase Be aware of adjusting the bottom height for the DFS before installing the monitor Work along the below protocol to set the right height Adjusting new lower position only upwards Plug in power and lower the lifting head to its lower limit Use the rear mounted transmitter to control he system Press the buttons UP en DOWN at the same time until the mounting head moves up and down shortl...

Страница 12: ...out the transmitter from the system Unplug the power for 20 seconds Plug in power for 10 seconds Unplug power for 2 seconds Plug back in the power the motor will rotate for a few seconds When the motor has stopped press the small prog button on the back of the PCB see picture The motor will rotate left and right shortly Audipack Industriestraat 2 2751 GT Moerkapelle 31 0 79 593 1671 Programm butto...

Страница 13: ...E Maximum load 85 Kg with the Audipack L S5 mounting interface 120 Kg with the VESA 400 combined with the Audipack cams 160 Kg with the VESA 600 combined with the Audipack cams Power supply 230 VAC 50 60 Hz Max Motor runing time 4 minutes 10 minuten cool down period For questions and technical support please contact Audipack or the reseller Audipack 31 0 79 5931671 dept Technicl support Notes ...

Отзывы: