 Secure Data Path Applicationv  20

9 Troubleshooting

The fault LED indicates that a signal is being received, but the signal contains enough faults to make 
the port fail and go into bypass mode. 

Port LEDs on the ATTO FibreCenter are 
generally lighted if the port is enabled through the 
Setup CLI command and an active device is 
connected to the port. However, if you want to test 
your configurations without having active devices 
attached to the ports, enter the command Switch-

Forcemode while in the command line interface. 
If the FibreCenter is not in force mode, however, 
the port LEDs will behave as illustrated in the 
table below.

LED

If LED is illuminated

If LED is not illuminated

OnLine

Port is on-line and functioning properly

No cable connected

Cable connected, but no device or host connected to cable

Cable connected between hub and connected device or 
host, but the device is powered off

Fault

See information below

ATTO FibreCenter port is operating properly

Power A

ATTO FibreCenter is receiving power 
through power supply A

Power supply A is not installed or turned on

A power supply is active, but the FibreCenter is not receiving 
power through power supply A

Power B

ATTO FibreCenter is receiving power 
through power supply B

Power supply B is not installed or turned on

A power supply is active, but the FibreCenter is not receiving 
power through power supply B

Fault LED 

Condition

ON

Port has been taken off-line, because it is not receiving proper signals due to the following:

Port is receiving bad / discontinuous signals

Bad cables

Device connected to the port is powered on, but failed

Cable may be too long / signal has deteriorated 

SFP fault – an internal fault within the SFP connected to the port requires replacement. 

Содержание FibreCenter 3400

Страница 1: ...02 ATTO Technology Inc All rights reserved All brand or product names are trademarks of their respective holders No part of this manual may be reproduced in any form or by any means without the expres...

Страница 2: ......

Страница 3: ......

Страница 4: ...emoving a power module 5 Setting up the ATTO FibreCenter 9 Installing the FibreCenter To change the password Connecting Fibre Channel ports Cabling Removing the FibreCenter 6 Configuring the ATTO Fibr...

Страница 5: ...Reset Setup Switch Switch Delay 8 Updating firmware 19 Linux Kernel Update Flash File System FFS Update 9 Troubleshooting 20 Index Command Line Interface i Appendix A Standards and compliances iii Ap...

Страница 6: ...olerance and load balancing by supporting server clustering and failover the ability for one server to take over for another in the event of a failure The ATTO FibreCenter 3400 hub integrates industry...

Страница 7: ...n NL port A port that connects a node in Fibre Channel arbitrated loop POST Power On Systems Test a series of self diagnostic tests stored in RAM which run when power is first applied to a component s...

Страница 8: ...et cable 5 Connect Fibre Channel devices to the ATTO FibreCenter using SFPs and standard cables manufactured for Fibre Channel use 6 Connect a host computer to the FibreCenter 3400 The default IP addr...

Страница 9: ...speed 1 Gigabit or 2 Gigabit Ports 2 3 and 4 may access port 1 but only one at a time under control of the Command Line Interface Setup and Switch commands Ports 6 7 and 8 may access port 5 but only o...

Страница 10: ...ions Eight 2 Gigabit Fibre Channel ports with Small Formfactor Pluggable SFP interface 400 MB sec maximum throughput in full duplex mode per zone Auto negotiation between 2 Gigabit and 1 Gigabit modes...

Страница 11: ...Secure Data Path Applicationv 6 Exhibit 3 1 Front view of the FibreCenter 3400 Exhibit 3 2 Module view of the FibreCenter 3400...

Страница 12: ...dules installed will have a total of 32 CFM of airflow Air enters through the sides of the enclosure and is exhausted out the power modules Ambient air near the inlets should not exceed 40 C WARNING D...

Страница 13: ...the world Installing a power module 1 Make sure the power switch on the rear of the power module is in the off position and the power cord is disconnected 2 Slide the power module into the rack enclo...

Страница 14: ...bre Channel devices to the ATTO FibreCenter using SFPs and standard cables manufactured for Fibre Channel use Cable limitations are listed in the chart on the next page The Online LED illuminates for...

Страница 15: ...at only one port of the FibreCenter 3400 or multiple hubs daisy chained together are connected to the switch Youmay not connect ports frommultipleswitches to the same loop FibreCenter 3400 Cabling Fib...

Страница 16: ...d return ports are labeled with letters Zone 2 and Zone 3 do not overlap Within a zone all ports are disabled except the lowest numbered port counting from the left and the single other port to which...

Страница 17: ...Switch commands Each zone is independent of the other and so may be configured to run at different or the same speeds 1 Gigabit or 2 Gigabit Ports 2 3 and 4 may access port 1 but only one at a time Po...

Страница 18: ...connections are assumed to be between port 1 and 2 3 4 5 6 7 8 in zone 1 between port 1 and 2 3 4 in zone 2 and between port 5 and 6 7 8 in zone 3 In the Get Switch command return ports are labeled wi...

Страница 19: ...resent RACK 000 or 000 required parameters LL Hub zone 01 02 03 C Channel or port number such as 2 3 4 5 6 7 8 in single zone Zone 1 configuration Exhibit 7 4 A typical command response sequence durin...

Страница 20: ...efaults Information none reset rack 000 or power cycle Idle Timeout Sets time period in seconds after which if there is no action on the Telnet port the Telnet session is shut down Default 60 minutes...

Страница 21: ...none Information get Status 000 Return syntax Status 000 PS1 PP FAN1 FF PS2 PP FAN2 FF KEY K Return example Status 000 PS1 OK FAN1 OK PS2 OK FAN2 OK KEY L Telnet Status Returns the Telnet status Limit...

Страница 22: ...ne 02 in 1 Gb zone 03 as 2 Gb Return RACK 000 Rate 1 0 0 1Gb in zone 01 Reset Performs a warm boot including POST and refreshes all configuration settings All software in Flash memory is reloaded into...

Страница 23: ...s configuration implement with switch after setup switch commands 1 setup 000 0120 switch 000 A 1 setup 000 0130 switch 000 B 1 setup 000 0140 switch 000 C 1 setup 000 0150 switch 000 D 1 setup 000 01...

Страница 24: ...a new Linux kernel 6 On the host name the new kernel file mtdchar0 if this is not its name already 7 FTP the file mtdchar0 from the host to dev on the FibreCenter 3400 8 When the FTP process is comple...

Страница 25: ...ut no device or host connected to cable Cable connected between hub and connected device or host but the device is powered off Fault See information below ATTO FibreCenter port is operating properly P...

Страница 26: ...uter 0 1 0 1 15 Echo on set RACK 000 echo off 15 Factory Defaults set RACK 000 factory defaults 15 Flush flush 000 17 Idle Timeout 60 minutes set RACK 000 idle timeout 30 15 IP Address 192 168 1 1 set...

Страница 27: ...erence to radio and television reception which can be determined by turning the equipment off and on try to correct the interference by one or more of the following measures Move the receiving antenna...

Страница 28: ...ne Monday through Friday Eastern Standard Time 8 00 a m to 8 00 p m or by fax and web site 24 hours a day ATTO Technology Inc 155 CrossPoint Parkway Amherst New York 14068 716 691 1999 voice 716 691 9...

Отзывы: