background image

11 ATTO FibreCenter 3400 

Ins

tallation and Operation Manual

6 Configuring the ATTO FibreCenter

The ATTO FibreCenter 3400 may be configured as one 8-port hub (Zone 1) or two 4-port hubs (Zone 2 
and Zone 3). Each Fibre Channel bus in the two-zone configuration can run at different speeds (1Gb or 
2Gb). The zones may be configured as either a one or two A-B style switch in a FC-AL loop. 
Configuration is managed through a 10/100 BaseT Ethernet port.

The software necessary to drive the FibreCenter 
3400 consists of two segments: the switching 
logic and the command-processing logic.

The switching logic sets up hardware 
configurations. The command-processing logic 
allows you to change parameters on the 
FibreCenter 3400 and view responses and other 
information about the hub and its performance via 
a Telnet server program and command line 
interface commands (see Chapter 7.3)

The ATTO FibreCenter 3400 may be configured 
as one 8-port hub (Zone 1) or two 4-port hubs 
(Zone 2 and Zone 3) using the Setup and Switch 
CLI commands. Each Fibre Channel bus in the 
two-zone configuration can run at different speeds 
(1Gb or 2Gb). The zones may be configured as 
either a one or two A-B style switch in a FC-AL 
loop. A zone is defined by the following 
parameters: 

 ❈

A zone contains only adjacent ports.

 ❈

Except for the Get Switch command return, 
Ports are labeled P1 through P8: all 
connections are assumed to be between port 
P1 and  P2 | P3 | P4 | P5 | P6 | P7 | P8  in zone 
1, between port P1 and P2 | P3 | P4  in zone 2 
and between port P5 and P6 | P7 | P8 in zone 
3. In the Get Switch command return, ports 
are labeled with letters.

 ❈

Zone 2 and Zone 3 do not overlap. 

 ❈

Within a zone, all ports are disabled except 
the lowest-numbered port (counting from the 
left) and the single other port to which it is 
switched.

Data transfer when setting up zones

You must temporarily stop data transfer to the hub 
when you execute the Setup and Switch 
commands during setup of the ATTO FibreCenter. 

Only the initiators can stop data transfer; the 
FibreCenter cannot stop data transfers.

 ❈

If you are changing the FibreCenter 3400 
from a single-zone configuration to a dual-
zoned configuration, you must temporarily 
stop all data transfers from the host to the 
FibreCenter.

 ❈

If you are changing zone 2 setup in a dual-
zoned configuration, but not changing zone 
3, you must temporarily stop all data 
transfers from the host in zone 2 but data 
transfer may continue in zone 3.

 ❈

If you are changing from a dual-zoned 
configuration to a single-zoned 
configuration, you must temporarily stop all 
data from the host to the FibreCenter.

FibreCenter behavior on reset or power-up

The ATTO FibreCenter takes about 40 seconds to 
begin operation after power-up or execution of the 
Reset command. All ports are disabled during this 
40 seconds. When the FibreCenter begins 
operation, it will use its default configuration or 
the last mapping designated by the Setup and 
Switch commands.

Zone 1

The FibreCenter 3400 may be configured into one 
zone in which all eight ports are available. Up to 
seven devices may access the eighth port, one at a 
time. 

Zone 2 and Zone 3

The FibreCenter 3400 may be configured into two 
separate zones. In each zone, up to three devices 
may access the fourth port in that zone, one at a 
time. Devices in one zone may not access ports in 
the other zone.

Содержание FibreCenter 3400

Страница 1: ...02 ATTO Technology Inc All rights reserved All brand or product names are trademarks of their respective holders No part of this manual may be reproduced in any form or by any means without the expres...

Страница 2: ......

Страница 3: ......

Страница 4: ...emoving a power module 5 Setting up the ATTO FibreCenter 9 Installing the FibreCenter To change the password Connecting Fibre Channel ports Cabling Removing the FibreCenter 6 Configuring the ATTO Fibr...

Страница 5: ...Reset Setup Switch Switch Delay 8 Updating firmware 19 Linux Kernel Update Flash File System FFS Update 9 Troubleshooting 20 Index Command Line Interface i Appendix A Standards and compliances iii Ap...

Страница 6: ...olerance and load balancing by supporting server clustering and failover the ability for one server to take over for another in the event of a failure The ATTO FibreCenter 3400 hub integrates industry...

Страница 7: ...n NL port A port that connects a node in Fibre Channel arbitrated loop POST Power On Systems Test a series of self diagnostic tests stored in RAM which run when power is first applied to a component s...

Страница 8: ...et cable 5 Connect Fibre Channel devices to the ATTO FibreCenter using SFPs and standard cables manufactured for Fibre Channel use 6 Connect a host computer to the FibreCenter 3400 The default IP addr...

Страница 9: ...speed 1 Gigabit or 2 Gigabit Ports 2 3 and 4 may access port 1 but only one at a time under control of the Command Line Interface Setup and Switch commands Ports 6 7 and 8 may access port 5 but only o...

Страница 10: ...ions Eight 2 Gigabit Fibre Channel ports with Small Formfactor Pluggable SFP interface 400 MB sec maximum throughput in full duplex mode per zone Auto negotiation between 2 Gigabit and 1 Gigabit modes...

Страница 11: ...Secure Data Path Applicationv 6 Exhibit 3 1 Front view of the FibreCenter 3400 Exhibit 3 2 Module view of the FibreCenter 3400...

Страница 12: ...dules installed will have a total of 32 CFM of airflow Air enters through the sides of the enclosure and is exhausted out the power modules Ambient air near the inlets should not exceed 40 C WARNING D...

Страница 13: ...the world Installing a power module 1 Make sure the power switch on the rear of the power module is in the off position and the power cord is disconnected 2 Slide the power module into the rack enclo...

Страница 14: ...bre Channel devices to the ATTO FibreCenter using SFPs and standard cables manufactured for Fibre Channel use Cable limitations are listed in the chart on the next page The Online LED illuminates for...

Страница 15: ...at only one port of the FibreCenter 3400 or multiple hubs daisy chained together are connected to the switch Youmay not connect ports frommultipleswitches to the same loop FibreCenter 3400 Cabling Fib...

Страница 16: ...d return ports are labeled with letters Zone 2 and Zone 3 do not overlap Within a zone all ports are disabled except the lowest numbered port counting from the left and the single other port to which...

Страница 17: ...Switch commands Each zone is independent of the other and so may be configured to run at different or the same speeds 1 Gigabit or 2 Gigabit Ports 2 3 and 4 may access port 1 but only one at a time Po...

Страница 18: ...connections are assumed to be between port 1 and 2 3 4 5 6 7 8 in zone 1 between port 1 and 2 3 4 in zone 2 and between port 5 and 6 7 8 in zone 3 In the Get Switch command return ports are labeled wi...

Страница 19: ...resent RACK 000 or 000 required parameters LL Hub zone 01 02 03 C Channel or port number such as 2 3 4 5 6 7 8 in single zone Zone 1 configuration Exhibit 7 4 A typical command response sequence durin...

Страница 20: ...efaults Information none reset rack 000 or power cycle Idle Timeout Sets time period in seconds after which if there is no action on the Telnet port the Telnet session is shut down Default 60 minutes...

Страница 21: ...none Information get Status 000 Return syntax Status 000 PS1 PP FAN1 FF PS2 PP FAN2 FF KEY K Return example Status 000 PS1 OK FAN1 OK PS2 OK FAN2 OK KEY L Telnet Status Returns the Telnet status Limit...

Страница 22: ...ne 02 in 1 Gb zone 03 as 2 Gb Return RACK 000 Rate 1 0 0 1Gb in zone 01 Reset Performs a warm boot including POST and refreshes all configuration settings All software in Flash memory is reloaded into...

Страница 23: ...s configuration implement with switch after setup switch commands 1 setup 000 0120 switch 000 A 1 setup 000 0130 switch 000 B 1 setup 000 0140 switch 000 C 1 setup 000 0150 switch 000 D 1 setup 000 01...

Страница 24: ...a new Linux kernel 6 On the host name the new kernel file mtdchar0 if this is not its name already 7 FTP the file mtdchar0 from the host to dev on the FibreCenter 3400 8 When the FTP process is comple...

Страница 25: ...ut no device or host connected to cable Cable connected between hub and connected device or host but the device is powered off Fault See information below ATTO FibreCenter port is operating properly P...

Страница 26: ...uter 0 1 0 1 15 Echo on set RACK 000 echo off 15 Factory Defaults set RACK 000 factory defaults 15 Flush flush 000 17 Idle Timeout 60 minutes set RACK 000 idle timeout 30 15 IP Address 192 168 1 1 set...

Страница 27: ...erence to radio and television reception which can be determined by turning the equipment off and on try to correct the interference by one or more of the following measures Move the receiving antenna...

Страница 28: ...ne Monday through Friday Eastern Standard Time 8 00 a m to 8 00 p m or by fax and web site 24 hours a day ATTO Technology Inc 155 CrossPoint Parkway Amherst New York 14068 716 691 1999 voice 716 691 9...

Отзывы: