![ATT Hammer Jet v1 Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/att/hammer-jet-v1/hammer-jet-v1_operating-manual_3005308032.webp)
32
Display shut down
Figure 43 – Display shut down
1) By pushing the “0” on the “Power” button the
display and the entire unit will turn off after
app. 7 minutes.
Re-fuelling
1) Refuel when empty for preparation of the next utilisation of the
Hammer Jet. Premix turbine oil and fuel in a separate canister (plastic
canisters are recommended). Refill by removing the “Fuel Tank Cap”.
Avoid spilling of fuel by utilising e.g. a funnel. After refuelling ensure
cleaning and proper installing of the “Fuel Tank Cap”.
Figure 44 – Refuelling (3.8L/1G)