![ATT Hammer Jet v1 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/att/hammer-jet-v1/hammer-jet-v1_operating-manual_3005308017.webp)
17
Figure 7 - Starting position of the Hammer Jet
Do not transport or store the Hammer Jet before it has cooled down completely (nozzle
temperature must be below 50°C/122°F.
Only use the dedicated Hammer Jet Transport Box, when not in use, and for storing and
transportation the Hammer Jet. This will shelf the product against dents, dust and dirt.
Always keep the Hammer Jet Transport Box clean and tidy.
.
Before start-up
Figure 8 - Fuel mix and amount
1) Place the Hammer Jet in
horizontal
position
(to ensure proper fuel
supply).
2) Do not try to start in any other
angles, since this can cause excessive
fuel leakage, overheating and
malfunction, which may lead to
permanent damage.
1) Ensure correct fuel mix and sufficient fuel amount
to perform start-up and operation of the turbine.