![ATS TTV1EEM-3T Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/ats/ttv1eem-3t/ttv1eem-3t_installation-operation-and-maintenance-manual_3005263004.webp)
Aqua Treatment Service ©2013 • www.aquat.com
2
4. Drain Line Connection
• Thread taped drain fitting into by-pass drainport.
• Connect ½" I.D. plastic tubing to drain fitting with clip.
• Do not exceed 6ft. elevation or 20ft. Run to drain.
• Leaving 1½" air gap run drain to floor drain, laundry tray or
septic/sewer line with trap.
5. Brine Line Connection
• Install air check on threaded connection.
• Run tubing from compression fitting on air check to compression
fitting on brine tank.
6. Overflow Line Connection
• Attach length of ½-inch (1.3) I.D. tubing (not supplied) to fitting
and run to drain. Do not elevate overflow line higher than 3 inches
(7.6cm) below bottom of overflow fitting. Do not tie drain line of
the equipment control. Overflow line must be a direct, separate
line from overflow fitting to drain. Allow an air gap as per drain
line instructions.
7. Electrical Connection
• Remove twist tie from cord set and extend cord to its full length.
Plug into socket that will accept 3-prong. Be sure the electrical outlet
is not controlled by a wall switch. Set timer to current time of day.
Pre Installation Check List
Water Pressure
—
A minimum of 30 psi is required for regenerated of
the unit. If the water pressure is over 100 psi, a pressure reducing valve
must be installed before the equipment and set at 85 psi
Electrical
—
A grounded electrical outlet with a continuous supply of
110 to 120 volt - 60 hertz current should be located at installation site of
the equipment.
A drain, must be available within 20 feet of the equipment.
Location of the equipment must be where it is not subject of freezing,
direct sunlight or room Temperature over 120 °F.
A minimum of 4 gallons per minute must be available for proper
backwash/regeneration.
The equipment must be installed in the cold water line after the well pres-
sure tank or water meter and before it branches off to the
water heater.
Installation
1. All plumbing must conform to local codes
2. Location Selection
• If it is likely that supplementary water treatment equipment will be
required, make certain adequate additional space is available.
• Since salt must be added periodically to the equipment, the location
should be easily accessible.
• Do not install any equipment closer to a water heater than a total
run of 10 feet of piping between the outlet of the equipment and the
inlet to the heater.
3. Water Line Connection
• A by-pass valve system must be installed since there will be
occasions when the equipment must be by-passed for raw water or
for servicing.
• Temporarily attach by-pass to back of control valve.
• Close main water supply valve.
• Open faucets to relieve water pressure and drain system.
• Move the equipment into installation position.
• After taking all measurements for required piping, disconnect
by-pass from control and move the equipment to a safe location.
• Cut, fit and solder plumbing.
• Solder plumbing to by-pass valve, raw water line to inlet, house line
to outlet.
• Move equipment back into position and connect by-pass valve.
• Fill brine tank with Solar Salt.
General Installation Instructions
Содержание TTV1EEM-3T
Страница 2: ...Aqua Treatment Service 2013 www aquat com...
Страница 16: ...Aqua Treatment Service 2013 www aquat com 14 Parts Breakdown...
Страница 17: ...Aqua Treatment Service 2013 www aquat com 15 Parts Breakdown cont...
Страница 19: ...Aqua Treatment Service 2013 www aquat com 17 Parts Breakdown cont...
Страница 22: ...Aqua Treatment Service 2013 www aquat com 20 Parts Breakdown cont...