Step 5CS –
- Allows selection of one of the following
using the
V
or
W
buttons:
• the Control Valve to have no hard water bypass;
• the Control Valve to act as an alternator; or
• the Control Valve to have a separate source during the
regeneration cycle.
Select OFF when none of these features are used.
Only use Clack No Hard Water Bypass Valves or
Clack Motorized Alternating Valves (MAV) with these
selections. Clack No Hard Water Bypass Valves (1” or 1.25” V3070FF or V3070FM) are not designed to be used with the alternator or separate
source functions. The V3063 and V3063BSPT motorized alternating valves are not designed to be used as a no hard water bypass or separate
source inlet if the pressure differential is more than 60 psi.
Con guring the Control Valve for No Hard Water Bypass Operation:
Select nHbP for control operation. For no hard water bypass operation the three wire connector is not used.
Selection requires that a connection to MAV or a Clack No Hard Water Bypass Valve is made to the two pin connector labeled ALTERNATOR
DRIVE located on the printed circuit board. If using a MAV, the A port of the MAV must be plugged and the valve outlet connected to the B
port. When set to nHbP the MAV will be driven closed before the rst regeneration cycle that is not FILL or SOFTENING or FILTERING, and
be driven open after the last regeneration cycle that is not FILL.
NOTE: If the control valve enters into an error state during regeneration mode, the no hard water bypass valve will remain in its current state
until the error is corrected and reset.
Con guring the Control Valve for Separate Source Operation:
Select nHbP for control operation. For separate source operation the three wire connector is not used.
Selection requires that a connection to a Clack Motorized Alternator Valve (MAV) is made to the two pin connector labeled ALTERNATOR
DRIVE located on the printed circuit board. The C port of the MAV must be connected to the valve inlet and the A port connected to the separate
source used during regeneration. The B port must be connected to the feed water supply.
When set to nHbP the MAV will be driven closed before the rst regeneration cycle, and be driven open after the last regeneration cycle.
NOTE: If the control valve enters into an error state during regeneration mode, the MAV will remain in its current state until the error is
corrected and reset.
Selecting the Control Valve to act as an alternator:
Prior to starting the programming steps, connect the interconnect cable to each control valve board’s three pin connector labeled
“INTERCONNECT”. Also connect the meter cord to either control valve to the three pin connector labeled “METER”.
Valve Programming Steps
Con guration
Settings
Step 3CS
Select Volume
Set Volume
Con guration
Settings
Step 4CS
Set regeneration time option to “On O”.
Set regeneration time option to “On O”.
Con guration
Settings
Step5CS
Set to ALTA
Connect ALTA valve to the MAV’s A
port and connect the MAV’s two pin wire
connector to the two pin connector labeled
“DRIVE” on the ALTA valve
Set to ALTb
Connect ALTb valve to the MAV’s B port. No
connections between the ALTB valve and the MAV
are made.
Installer Display
Setting
Step 2I
Enter the Volumetric Capacity for the System
Enter the Volumetric Capacity for the System (the
same as Valve A)
Installer Display
Setting
Step 3I
Set Day Over ride to “oFF”
Set Day Over ride to “oFF”
NOTE: If the control valve is in an error state during regeneration mode the MAV will close the B port and keep open the A port until the error is
corrected and reset.
For Clack Corporation alternator systems using the WS1, WS1.25, WS1.5 and WS2L valves the stand by tank will be periodically brought on
line for a short time to keep its bed fresh. The logic is that once a tank is in standby and the time has passed either 6 AM or 6 PM (18:00) at the
next and all subsequent 6 AM and 6 PM times the stand by tank will be brought on line until 10 gallons (37.8 liters) has passed through it. It
will then be placed back on standby.
For Clack Corporation alternator systems using the WS2 valve, when NEXT is pressed after selecting ALTA or ALTb, a display will allow the
user to set the amount of pre-service rinse time for the stand by tank just prior to returning to service.
Press NEXT to go to Step 6CS. Press REGEN to return to previous step.
Step 5CS
Volume
Volume
Control Valve cont:
Содержание TTV1EEM-3T
Страница 2: ...Aqua Treatment Service 2013 www aquat com...
Страница 16: ...Aqua Treatment Service 2013 www aquat com 14 Parts Breakdown...
Страница 17: ...Aqua Treatment Service 2013 www aquat com 15 Parts Breakdown cont...
Страница 19: ...Aqua Treatment Service 2013 www aquat com 17 Parts Breakdown cont...
Страница 22: ...Aqua Treatment Service 2013 www aquat com 20 Parts Breakdown cont...