![ATS RTFO Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/ats/rtfo/rtfo_instruction-manual_3005238018.webp)
MAN - RTFO - REV: Org | E. Verification
14
E. Verification
E.1 Temperature Verification
1. Insert a temperature proble into the top left port-hole.
2. Connect probe with a brass block to the RTD inside (right side).
3. Allow oven to preheat.
4. Allow unit to heat up and stabilize.
5. Once stabilized at the temperature that needs verifying, take five readings 10 minutes apart and compare results.
E.2 Verification of Air Flow
1. Attach a flow verification device to the copper tubing inside the RTFO (Sec. C.2, Fig. C.3) (if using a flow through
device the orifice can be removed from the tubing and attached to the downstream end).
2. Allow 15 minutes to stabilize.
3. Take 5 comparison readings every 3-5 minutes. 3 readings minimum, 5 recommended.