MAN - PAV4 - REV: Original | D. Installation
7
D. Installation
D.1 Unpacking
Carefully unpack the equipment and inspect it for damage during shipment. Retain all cartons and packing materials
until the unit is operated and found to be in good condition. If damage has occurred during shipping, notify the carrier
and ATS immediately. If it is necessary to file a damage claim, retain the packaging materials for inspection by the
carrier.
D.2 Installation
1. Use an overhead crane or forklift to remove the PAV from the crate and position it in the desired location.
2. Position the PAV in the testing position, such as on the PAV heavy-duty steel stand or on a workbench or lift cart.
CAUTION: All supporting and contacting surfaces must be nonflammable. Do not allow
flammable materials to contact the shell.
3. Level the PAV by adjusting the screws on the four feet.
4. Inspect the O-ring seal. Make sure it is clean and lightly coated with silicone grease. If the O-ring appears to be
worn or damaged, contact ATS.
D.3 Pan Holder Leveling
1. Once the PAV is in place, you will need to verify that the leveling ring is evenly balanced. The leveling ring is
removed prior to shipment, and needs to be checked on a level surface with a level, prior to placing it back in the
vessel.
WARNING: When placing the level and the parallel bar onto the ring, do not interfere with the
RTD located in the bottom of the pressure vessel. The RTD is factory-set and should not be
moved.
2. If the level indicates that the ring is not evenly balanced, make the necessary corrections by rotating the three
vertical-set screws to lower or raise the ring. use a 1/8” hex wrench to make this adjustment.
3. After leveling the ring, hand rotate the horizontal-set screws in order to secure the ring in the bottom of the vessel.