
Shipping/Handling and Installation 3-19
3.6.8.1 Prepare the dial gauge set and granite squareness rule.
3.6.8.2 Place the granite squareness rule on the working table.
3.6.8.3 Hold the dial gauge set directly under the spindle.
3.6.8.4 In each of the three directions, move either the headstock or working table
along some distances, then level the machine until readings at both ends are
the same.
3.6.8.5 Ensure moving or rotating parts do not interfere with the sheet metal
construction.
3.6.8.6 Ensure positions of ballscrews and bearings do not shift.
3.6.9 Spindle Bearing Clearance Adjustment
3.6.9.1 Remove the spindle side guide.
3.6.9.2 Arrange the dial gauge set as before. Adjust the adjust-nut until radial
readings of the rotating spindle are constant.
3.6.9.3 Ensure adjust nuts are tight.
Содержание AL52
Страница 1: ...AL52 AM52...
Страница 4: ......
Страница 5: ...Chapter 1 Machine Safety Regulation...
Страница 29: ...Chapter 2 Machine Specification...
Страница 37: ...2 8 Machine Specification AL52 Column height...
Страница 40: ...Machine Specification 2 11 2 10 Dimensions of the Working Table AL52 AM52...
Страница 41: ...2 12 Machine Specification 2 11 Dimensions of the Tool Holder 2 11 1 BT 40 JIS Specification...
Страница 42: ...Machine Specification 2 13 2 11 2 V40 ANSI Specification...
Страница 43: ...2 14 Machine Specification 2 11 3 V40 CT Specification...
Страница 44: ...Machine Specification 2 15 2 11 4 CAT 40 Specification Unit inch...
Страница 45: ...2 16 Machine Specification 2 12 Specifications of the Tool...
Страница 48: ......
Страница 49: ...Chapter 3 Shipping Handling and Installation...
Страница 52: ...Shipping Handling and Installation 3 3 AL52 AM52...
Страница 54: ...Shipping Handling and Installation 3 5...
Страница 60: ...Shipping Handling and Installation 3 11 Move work piece to table Lock the bolt and positioning block...
Страница 63: ...3 14 Shipping Handling and Installation...
Страница 72: ...Chapter 6 Lubrication...
Страница 76: ...6 4 Lubrication EV 860 1050 Operation s Maintenance Manual AM52...
Страница 77: ...Lubrication 6 5 Operation s Maintenance Manual EV 860 1050 6 2 2 Oil lubrication Cooling Diagram...
Страница 80: ...Chapter 7 Mechanism...
Страница 97: ...7 17 Mechanism...
Страница 98: ...Chapter 8 Pneumatic Coolant Systems...
Страница 101: ...8 3 Pneumatic Coolant Systems 8 2 Schematic Diagram of the Pneumatic Piping System...
Страница 105: ...8 7 Pneumatic Coolant Systems 8 5 Schematic Diagram of the Coolant System...
Страница 106: ...Chapter 9 Preventive Maintenance...
Страница 110: ...PARTS NO MM0100030A Mar 2019...