![Atlas SLP-7K Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/atlas/slp-7k/slp-7k_manual_3001399018.webp)
REV. 01 2012
19 / 30
CHAPTER 7 - INSTALLATION
Only skilled technicians, appointed by the manufacturer, or by authorized
dealers, must be allowed to carry out installation. Serious damage to people and
to the lift can be caused if installations are made by unskilled personnel.
Before carrying out any operations, remember to insert the safety piece of wood
between the lower booms and the base frame
.
7.1
CHECKING FOR ROOM SUITABILITY
The lift has been designed to be used in covered and sheltered places free of overhead obstructions.
The place of installation must not be next to washing areas, painting workbenches, solvent or varnish
deposits. Installation near rooms where a dangerous situation of explosion can occur, is strictly
forbidden. The relevant standards of the local Health and Safety at Work regulations, for instance,
with respect to minimum distance to wall or other equipment, escapes and the like, must be observed.
7.2 LIGHTING
Lighting must be carried out according to the effective regulations of the place of installation. All
areas next to the lift must be well and uniformly lit.
7.3 INSTALLATION
SURFACE
The lift must be placed on a 425 concrete floor with FEB 215 K reinforcement, minimum 6 inches
thick, and in conformity with local regulations.
If a floor covering with the above mentioned requirements is not available, a foundation plate is
needed, or some fixing points should be used for fixing areas at least having sufficient size and
thickness (made of concrete of the same quality, as shown).
The surface where the lift has to be installed must be even and level in all directions. An inclination
not higher than 1 inch in drive-on lift direction and ½ inch cross-wise can be balanced with leveling
wedges.
For installation on raised surface, the compliance with the maximum carrying capacity of the surface
is recommended.
The new concrete must be adequately cured by at least 21 days minimum.
7.4
RUNWAY ASSEMBLY AND CONTROL UNIT POSITIONING
Unauthorized persons are not allowed to enter during assembly...
x
Now locate the lift according to the figure 2, use a carpenters chalk line to layout a grid for
the base locations according to the drive-on direction of the lift.
x
Transport platforms to the installation site by using hoisting means with load capacity of at
least
1,100 LBS.
To prevent the platform from dropping during transport, it should be lifted
according to its center of gravity.
x
Always raise platforms by holding them on the underside of the bases.
Содержание SLP-7K
Страница 10: ...REV 01 2012 11 30 Figure 2 LAYOUT ...