6
B. Equipment storage and installation requirements.
The equipment should be stored or installed in a shady, normal temperature,
ventilated and dry place.
C. The equipment should be unloaded and transferred by forklift.
D. SPECIFICATIONS OF CONCRETE
(See Fig. 6)
Concrete must adhere to the specifications listed below, failure to do so
may result in lift and/or vehicle falling.
1. Concrete must be thickness 4
”
minimum, without reinforcing steel bars, and
must be completely dry before lift installation.
2. Concrete must be in good condition and must be of test strength 3,000 psi
(210kg/cm²) minimum.
3. Floors must be level with no cracks or holes.
E. POWER SUPPLY
220volt single phase source on a 30amp breaker with minimum of 10 gauge
wire running to the power unit. Operating voltage range is 208v-230v.
Fig.6
Concrete intensive must be
3,000psi (210kg/cm²)
¾”
Fig.5
4
”
Содержание Atlas PV-10HPX
Страница 1: ...1 Model PV10PX Revised 05 25 2021 ...
Страница 10: ...10 D Install parts of extension columns See Fig 16 Fig 16 24 26 20 42 25 37 41 ...
Страница 18: ...18 K Raise the carriages up by hand so they are locked at the same level See Fig 26 Fig 26 ...
Страница 20: ...20 1 2 Connecting cable for high setting See Fig 28 Cable 1 Cable 2 Cable 1 High setting Fig 28 ...
Страница 22: ...22 Install power unit See Fig 30 Fig 30 ...
Страница 30: ...30 IV EXPLODED VIEW Model 211SAC Fig 43 ...
Страница 38: ...38 4 5 POWER UNIT EXPLODED VIEW 220V 60Hz Single Phase Fig 48 ...