![Atlas Copco GA 11 VSD+ Скачать руководство пользователя страница 89](http://html.mh-extra.com/html/atlas-copco/ga-11-vsd/ga-11-vsd_instruction-book_3001655089.webp)
Reference
Designation
Reference
Designation
BV2
Thermostatic bypass valve of ER
unit
OF
Oil filter
HE
Oil/water heat exchanger (ER
unit)
AR
Oil separator vessel
E
Compressor element
BV1
Thermostatic bypass valve in oil
filter housing
Co
Oil cooler (compressor)
Ca
Aftercooler (compressor)
1
Water inlet
2
Water outlet
BV1 starts closing the bypass line over the oil cooling circuit at the lower limit of its temperature range. At
the upper limit of its temperature range, the bypass line is completely closed and all the oil flows through
the oil cooling circuit.
BV2 starts closing the bypass line over the ER heat exchanger (HE) at the lower limit of its temperature
range. At the upper limit of its temperature range, the bypass line is completely closed and all the oil flows
through the main oil cooler (Co).
Bypass valve BV1 starts opening at 71 ˚C (160 ˚F) and is completely open at 85 ˚C (185 ˚F).
Bypass valve BV2 starts opening at 75 ˚C (167 ˚F) and is completely open at 90 ˚C (194 ˚F).
The ER system can be provided with bypass valves at the water side
When the ball valves are in position (A), as shown on the ER label, the ER unit is integrated in the water
circuit and will recover energy.
When the ball valves are in position (B), the heat exchanger (HE) is bypassed and no energy will be
recovered.
Instruction book
2920 7109 23
87
Содержание GA 11 VSD+
Страница 1: ...Atlas Copco Oil injected rotary screw compressors GA 7 VSD GA 11 VSD GA 15 VSD Instruction book ...
Страница 2: ......
Страница 16: ...2 2 Flow diagram GA 7 VSD up to GA 15 VSD Workplace Instruction book 14 2920 7109 23 ...
Страница 88: ...Flow diagram of compressor with energy recovery system Instruction book 86 2920 7109 23 ...
Страница 136: ......
Страница 137: ......