Connect the shaft on the drive unit
1. Lift the locking piston (A) on the drive unit (D).
A
B
C
D
2. Insert the
fl
exible shaft (B) into the hole in the
drive unit.
3. Make sure that the square
fi
tting of the
fl
exible
shaft (C)
fi
ts the square tube on the drive unit
(D).
4. Secure the vibrator tube to the
fl
exible shaft by
screwing it with left-hand
5. Plug the drive unit (D) into the power socket
and start the machine.
Vibrating
NOTICE
Never use the poker vibrator to move
the concrete sideways.
1. Allow the vibrator to penetrate about 15 cm (6
in.) down into the nearest lower layer to ensure
that the various layers merge well with each
other.
2. Fill the concrete evenly in the form work in 30 -
50 cm (12 - 19 in.) layers.
30-50 cm
(11-19 in.)
30-50 cm
(11-19 in.)
15 cm
(6 in.)
3. Insert the poker vibrator vertically at a distance
of 8-10 times the tube diameter between
insertions.
4. Vibrate systematically.
5. Slowly withdraw the vibrator to allow the
concrete to re
fi
ll the cavity left by the vibrator.
6. The concrete is thoroughly vibrated when the
area around the vibrator turns shiny and no air
bubbles rise to the surface. This will normally
take about 10-20 seconds.
When taking a break
♦
During all breaks you must place the machine
in such a way that there is no risk for it to be
unintentionally started. Make sure to place the
machine on the ground, so that it can not fall.
♦
Switch off the power supply in the event of a
longer break or when leaving the workplace.