![background image](http://html1.mh-extra.com/html/atlantis/sl3f/sl3f_fitting-instructions-manual_3000512005.webp)
Any revisions must first be approved by the product designer. Version: 201710
Revision By: TD
GLASS RECEIVER CHANNEL MUST BE INSTALLED ONTO THE WATERPROOFING BEFORE THE WALLS ARE
TILED
INSTRUCTIONS FOR SL4
CONFIGURATION
Installer
–
When Architectural Finish is fitted to
base. Trim the internal leg off the wall channel to
adequately clear the base surface. Ensure the
wall channel interlocks correctly with the base.
1.
Choose the door direction.
2.
Position the glass receiver channels over the
base glazing
channel. Use a
straight edge and
mark the wall to
indicate where
the wall channel
is plumb.
3.
Apply a silicon seal to full length of channels.
Silicon used must be compatible with anodised
aluminium as well as the waterproofing being
used.
4.
Ensure the glass receiver channels are located
firmly over the base
glazing channel. The
machine recess in
the wall glazing
channel must firmly
locate over the base
glazing channel.
Locate the framing
timber. Use the 4mm
drill bit to drill holes through the glass receiver
channel. Fix four screws through the channels in
the wall framing (use wall plugs if required).
5.
Apply a continuous bead of silicon to the full
length of the channel and waterproofing,
indicated by the dark line (inside channel).
6.
INSTALLATION OF TOP RAIL BRACE END
CONNECTOR CHANNELS AND SPACERS
Fix the top rail brace end connector channel and
spacers directly below the indicator line on the
glass receiver
channels as
shown. Detail
shown below.
Must be accurate.
120mm from top
of wall channel to
top of end
connector
channel.