Any revisions must first be approved by the product designer.  Version: 201911 

Revision By:  JST 

1.

 

Mark the floor and wall for glazing channel 
positions as per size chart  

(refer page 3 of these instructions)

 

2.

 

Double sided tape has been adhered to the 
bottom of the floor glazing channel.  This will 
hold the floor glazing channels in place until the 
glass is in position. 
 

3.

 

Choose the door direction. 

 

 

 

 
 
 

4.

 

Position glass receiver 
channel over the base 
glazing channels. Use 
a straight edge and 
mark the wall to 
indicate where the 
wall channel is plumb.  

 

 

 

5.

 

Apply a silicon seal to full length of channels. 
Silicon used must be compatible with anodised 
aluminium as well as the waterproofing being 
used. 

 

 
 
 
 
 

6.

 

Ensure the glass receiver channel is located 
firmly over the base glazing channel. The 
machine recess in the wall glazing channel must 
firmly locate over the base glazing channel.  

 

 

 

 

 

 

7.

 

Locate the framing 
timber. Use the 4mm 
drill bit to drill holes 
through the glass 
receiver channels. Fix 
four screws through the 
channels in the wall 
framing (use wall plugs 
if required 

 bag18 

supplied with wall 
channels).  

8.

 

Apply a continuous bead of silicon to the full 
length of the channels and waterproofing, 
indicated by the dark line (inside channel). 

 

 

9.

 

INSTALLATION OF TOP RAIL BRACE END 
CONNECTOR CHANNELS AND SPACER 

Fix the top rail brace end connector channel 

(bag108SL) and spacer 
120mm down from top 
of wall channel 

(door 

side only)

.  

 
 
 
 
 
 

Содержание SL2F

Страница 1: ...ckers Phillips Screwdriver 1x Blue Masking Tape 1x BAG GB W 1x BAG GB B 1 x Bumper Pack 6 1 x Clear Silicon 1 x Screen Fitting Instructions Checked by ___________________ Date ________________________...

Страница 2: ...with a noticeable defect NOTE a noticeable defect must be visible to the naked eye in normal daylight conditions standing at a distance of two meters Any imperfection that is not visible within the ab...

Страница 3: ...the required size as per size chart for 2 Wall Showers Shower Size Cut Measurement Cut the overall length from the longest point 2 Wall nominal measurement X Cut measurement 900 885 1000 985 1100 1085...

Страница 4: ...d must be compatible with anodised aluminium as well as the waterproofing being used 6 Ensure the glass receiver channel is located firmly over the base glazing channel The machine recess in the wall...

Страница 5: ...ss panels and infill all connections of channels must be sealed with clear silicon supplied 12 Locate the glass panel SL R into the glazing channel The top of panel SL R must be level with the top of...

Страница 6: ...ating the outside disc Ensure the bottom of the door clears the floor tiles 17 CRITICAL SEAL Remove dust and dirt first Seal the connection between the glass receiver channel and the base glazing chan...

Страница 7: ...receiver channels Use spatula to remove the excess silicon Remove the masking tape immediately after application 24 SLIDING DOOR GUIDE BLOCK Slide the door as far back in an open position as possible...

Страница 8: ...804 Revision By JST SLIDING SCREEN GUIDE BLOCK CODE ABS LQ GB LONG Linea Quattro Installed on base or prior to tiling CODE ABS LQ GB SHORT Linea Quattro Used when installing frameless screens CODE ABS...

Отзывы: