
Any revisions must first be approved by the product designer. Version: 201911
Revision By: JST
1.
Mark the floor and wall for glazing channel
positions as per size chart
(refer page 3 of these instructions)
.
2.
Double sided tape has been adhered to the
bottom of the floor glazing channel. This will
hold the floor glazing channels in place until the
glass is in position.
3.
Choose the door direction.
4.
Position glass receiver
channel over the base
glazing channels. Use
a straight edge and
mark the wall to
indicate where the
wall channel is plumb.
5.
Apply a silicon seal to full length of channels.
Silicon used must be compatible with anodised
aluminium as well as the waterproofing being
used.
6.
Ensure the glass receiver channel is located
firmly over the base glazing channel. The
machine recess in the wall glazing channel must
firmly locate over the base glazing channel.
7.
Locate the framing
timber. Use the 4mm
drill bit to drill holes
through the glass
receiver channels. Fix
four screws through the
channels in the wall
framing (use wall plugs
if required
–
bag18
supplied with wall
channels).
8.
Apply a continuous bead of silicon to the full
length of the channels and waterproofing,
indicated by the dark line (inside channel).
9.
INSTALLATION OF TOP RAIL BRACE END
CONNECTOR CHANNELS AND SPACER
Fix the top rail brace end connector channel
(bag108SL) and spacer
120mm down from top
of wall channel
(door
side only)
.