manualshive.com logo in svg
background image

Any revisions must first be approved by the product designer.  Version: 201911 

Revision By:  JST 

 

DO NOT INSTALL DAMAGED OR 

DEFECTIVE PRODUCTS 

 

 

 

-

 

It is the installer’s responsibility to thoroughly check the glass panel prior to 

installation. 

-

 

Atlantis will take no responsibility for any glass panel that has been installed with a 

noticeable defect. 

NOTE: a noticeable defect must be visible to the naked eye, in normal daylight conditions, 

standing at a distance of two meters. 

Any imperfection that is not visible within the above noted parameters will not be accepted 

by Atlantis to be a defective product, and installation can proceed as usual. 

 

 

PLEASE NOTE: 

Stand glass upright at all times. Keep glass panels level with the floor to 

avoid damaging corners.

 

NO RESPONSIBILITY WILL BE TAKEN BY ATLANTIS FOR ANY GLASS BREAKAGES OR 

CHIPPED EDGES. 

 

 

 

 

 

 

 

 

 

Содержание SL2F

Страница 1: ...ckers Phillips Screwdriver 1x Blue Masking Tape 1x BAG GB W 1x BAG GB B 1 x Bumper Pack 6 1 x Clear Silicon 1 x Screen Fitting Instructions Checked by ___________________ Date ________________________...

Страница 2: ...with a noticeable defect NOTE a noticeable defect must be visible to the naked eye in normal daylight conditions standing at a distance of two meters Any imperfection that is not visible within the ab...

Страница 3: ...the required size as per size chart for 2 Wall Showers Shower Size Cut Measurement Cut the overall length from the longest point 2 Wall nominal measurement X Cut measurement 900 885 1000 985 1100 1085...

Страница 4: ...d must be compatible with anodised aluminium as well as the waterproofing being used 6 Ensure the glass receiver channel is located firmly over the base glazing channel The machine recess in the wall...

Страница 5: ...ss panels and infill all connections of channels must be sealed with clear silicon supplied 12 Locate the glass panel SL R into the glazing channel The top of panel SL R must be level with the top of...

Страница 6: ...ating the outside disc Ensure the bottom of the door clears the floor tiles 17 CRITICAL SEAL Remove dust and dirt first Seal the connection between the glass receiver channel and the base glazing chan...

Страница 7: ...receiver channels Use spatula to remove the excess silicon Remove the masking tape immediately after application 24 SLIDING DOOR GUIDE BLOCK Slide the door as far back in an open position as possible...

Страница 8: ...804 Revision By JST SLIDING SCREEN GUIDE BLOCK CODE ABS LQ GB LONG Linea Quattro Installed on base or prior to tiling CODE ABS LQ GB SHORT Linea Quattro Used when installing frameless screens CODE ABS...

Отзывы: