71
A.1.3 ViewPower
Situation
Solution
How to install the
Software.
Once started the UPS you can connect it to PC through USB
cable. At this time the SO detects and installs automatically all
drivers. Now you can install ViewPower on the PC.
PC doesn’t find the
UPS.
1.
Check if the cable is properly connected
2.
Use the original cable
3.
Verify Your IP and please change if You are using
192.168.5.x subnet.
A.1.4 Opeartion/Storage
The UPS system contains no user-serviceable parts. If the battery service life (3~5
years at 25°C ambient temperature) has been exceeded, the batteries must be
replaced. In this case, please contact your dealer.
Be sure to deliver the spent
battery to a recycling facility
or ship it to your dealer in
the replacement battery
packing material.
Storage
Before storing, charge the UPS 5 hours. Store the UPS covered and upright in a
cool, dry location. During storage, recharge the battery in accordance with the
following table:
Storage Temperature
Recharge Frequency
Charging Duration
-25°C - 40°C
Every 3 months
1-2 hours
40°C - 45°C
Every 2 months
1-2 hours
Содержание host power 1101rc
Страница 1: ......
Страница 51: ...51 Step 3 Put the front panel back to the unit Rack mount Installation Step 1 Step 2 ...
Страница 52: ...52 Tower Installation Step 1 Step 2 ...
Страница 75: ...75 Step 6 Connect the AC input and re connect battery wires and Put the front panel back to the unit ...
Страница 77: ...77 ...
Страница 84: ...Atlantis SpA Via S Antonio 8 10 20020 Lainate MI info atlantis land com www atlantis land com ...