® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Stand: 10/2013
57
Protocol of Installation/Handover certificate
Location:
2 post lift:
Company:
Producer:
Street:
Type/Model:
Town:
Serial n˚.:
Country:
Year of
production:
The above lift was installed, checked for function and security and it was put into operation.
The installation was performed by:
The operator
The expert / assembly operator
The operator confirms the correct installation of the lift, have to read and follow all the information of this manual and
checking book and keep accessible at all the times this manual.
The expert / assembly operator
confirms the correct installation of the lift, have to read and follow all the information of this
manual and checking book, hand over all relevant information and documentation and all the operators have been properly
instructed.
The operators confirm after installing and initial operation by a trained assembly operator of the manufacturer or an
authorized dealer (specialist) that it has been training in the using of the equipment.
Name and company stamp of the expert / assembly
operator
Date and signature of the expert / assembly operator
Name and company stamp of the operator
Date and signature of the operator
Name of the operator
Date and signature of the operator
Name of the operator
Date and signature of the operator
Name of the operator
Date and signature of the operator
Name of the operator
Date and signature of the operator