17
Max. inclination
13mm
Concrete drying time:
Min. 20 Days
If soils do not comply with the requirements, there could evoke serious injuries to personal or damages to the lift.
Do not install the lift on asphalt, soft concrete floor-
There must be no expansion joints or cuts, which will break the continuity of the upper reinforcement.
Load-capacity of false ceilings must be checked by operator.
Place of installation
B1
Distance main
post-wall
Min. 1.000mm
B2
Distance opposite
post- wall
Min. 700 mm
L1
Distance post -
wall
Min. 3200mm
L2
Distance post -
wall
Min. 3200mm
H
Celling weight
Check the
technical data
Permitted operating temperatures:
10-50 °C
Maximum permitted humidity:
≤80% By 30 °C
Low height above the sea level:
≤2000m
Power connection and ground cable (see technical data) it could be in form of plug connector (socket and plug device) or