QSG_ERD620_421.00_EN_01 / 2020-09-09
39
/
48
Starting up
POWER UP
1. Make sure that all the necessary connections are in
place.
Electrical: such as power supply, inputs/outputs
Pneumatic: including line pressure supply.
2. Power up your device
When power-up is completed, the
Program
screen is
displayed, with last program used on screen.
PREPARING A PROGRAM
Use this procedure to configure a new test program.
On the
MAIN MENU
screen:
ACCESSING THE PARAMETERS
1. Select
PARAMETERS
using the
up/down
keys
and then press
.
The program list is displayed.
SELECTING A PROGRAM NUMBER
2. Select the program to configure and press
.
A list of the available measurement types is displayed:
—
DIRECT ERD
type
—
INDIRECT ERD
type
—
OPERATOR
type (Option)
—
DIRECT FLOW
type
(Special option)
—
INDIRECT
type(Special option)
—
QUICK TEST
type. (Special option)
Содержание ERD620
Страница 1: ...ATEQ ERD620 Quick Start Guide...
Страница 10: ...QSG_ERD620_421 00_EN_01 2020 09 09 10 48 CONNECTORS ON THE BACK PANEL WITH ALL OPTIONS...
Страница 21: ...QSG_ERD620_421 00_EN_01 2020 09 09 21 48 Examples of frames exports...
Страница 22: ...QSG_ERD620_421 00_EN_01 2020 09 09 22 48...