![Atdec SYSTEMA SW6S Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/atdec/systema-sw6s/systema-sw6s_installation-instructions-manual_2996911003.webp)
SSS
SSW
Component Checklist
Systema | Monitor Spring Arm
VESA monitor head
Arm Assembly
! IMPORTANT - Install Systema Monitor Spring Arm as per installation instruction.
! This product supports a minimum load of 1.5kg (3.3lbs) and maximum load of 8kg (17.6lbs).
! The manufacturer accepts no responsibility for incorrect installation.
! Compatible with Systema Posts: SP10, SP40, SP75 and Wall Channels: SW6 & SW35.
IMPORTANT INFORMATION:
Step 1. Check Components
Check what you have received against the component checklist and hardware above.
Step 2. Mount Arm Assembly
M4 x 12/16/25mm (x4)
Black Phillips Head Mounting Screws
3/4mm Allen Keys
HARDWARE
Display Mounting Screws
Display Mounting
Spacers (x4)
M4 x 14mm (x1)
Silver Phillips Head
Security Screw
SYSTEMA
Installation Instructions
2.1
Remove Post Top Cap.
Existing Systema Post
2.2
Insert Arm Assembly into Channel
Note:
Ensure Clamp
Head Lever is vertical
and unlocked.
Note:
Squeeze and hold Clamp Head before
inserting into the channel on Post Assembly or
Wall Channel.
Arm Assembly
Pole Assembly
2.4
Lock Channel Clamp at
preferred height.
‘Click’
Allen Key
Post Top Cap
Post Assembly
2.5
Insert Post Top Cap into Post Assembly.
2.3
Move Channel Clamp to desired
height and ensure arm is supported.
Note:
An Allen Key
may be stored in the
Post Top Cap.
Wall Channel