ATC GTDHR FIRST Скачать руководство пользователя страница 29

 

GTDHR   FIRST / PREMIUM / INFINITE 

ENERGY RECOVERY UNIT 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTE: the first thing to check is that you do not have a "MANUAL" type fault 

MS-CDF-001 A 

Ind A 

update 01/07/2011  

Created by JC 

Validated by AR 

29 / 36 

Display

 

Description

 

Type

 

Time

 

Reason

 

Outdoor temp. 
probe error

 

Outdoor tempera-

ture probe error

 

C

 

5s

 

The outdoor temperature probe SEG is not working or is wrongly 
wired (see chapter V)

 

 

 

AS temp. 
probe error

 

Supply air tempera-

ture probe error

 

C

 

5s

 

The supply air temperature probe SSG is not working or is 
wrongly wired (see chapter V)

 

 

 

AR temp. 
probe error

 

Return air tempera-

ture probe error

 

C

 

5s

 

The return air temperature probe SRG is not working or is wrongly 
wired (see chapter V)

 

 

 

Def. temp. 
probe error

 

Defrost temperature 

probe error

 

C

 

5s

 

The defrost temperature probe SDG is not working or is wrongly 
wired (see chapter V)

 

 

 

Supp. temp. 
regulator error

 

Defrost battery 

probe error

 

C

 

5s

 

The defrost battery probe SBD is not working or is wrongly wired 
(see chapter V)

 

The resistance is not working or is wrongly wired

 

AS pressure  
probe error

 

AN pressure  probe 

error

 

C

 

5s

 

The new air pressure transmitter is not working or wrongly wired

 

 

 

AR pressure  
probe error

 

AE pressure  probe 

error

 

C

 

5s

 

The return air pressure transmitter is not working or wrongly wired

 

 

 

CO2 probe 
error

 

CO2 probe error

 

C

 

5s

 

The CO2 probe is not working or is wrongly wired

 

Manual Mode

 

Ventilation in man-

ual mode

 

C

 

0s

 

This is not a fault but an alert message, the unit is not at AUTO 
see chapter 

VII.3.6

 

…Manual

 

Working in manual 

mode

 

C

 

0s

 

You have touched a wrong parameter in the MANUAL AUTO tab 
(everything should be in AUTO)

 

Содержание GTDHR FIRST

Страница 1: ...GTDHR FIRST PREMIUM INFINITE ENERGY RECOVERY UNIT OPERATING AND MAINTENANCE INSTRUCTIONS MS CDF 001 A Ind A update 01 07 2011 Created by JC Validated by AR 1 36...

Страница 2: ...8 36 VI 3 Connection of the probes P 8 36 VI 4 Electric board s terminal P 9 to 11 36 VI 4 1 Power terminal connection 9008 to 9070 P 9 36 VI 4 2 Control terminal connection 9008 to 9070 P 10 and 11...

Страница 3: ...3 3 c CARMA MAC2 and QUATTRO EC P 23 36 VII 3 4 Temperature set point modification P 24 36 VII 3 5 CO2 set point modification P 24 36 VII 3 6 Unit start stop or forced LS HS start through the Corrigo...

Страница 4: ...ed into the environment I 3 Storing The equipment must be stored in shade in a dry place at a temperature between 20 C and 40 C II INSTALLATION II 1 Handling The units must only be moved in their inst...

Страница 5: ...ipe A siphon can only be used for one drainage system Note the si phon must be connected in accordance with Best Practices in order that the condensates are removed as efficiently as possible The heig...

Страница 6: ...dry contact NO Supply air temperature management with outdoor compensation air relationship III 5 CARMA MAC2 EC 1 or 2 CONSTANT flow rates as required m3 h Adjustment of 1 or 2 constant flow rates LS...

Страница 7: ...by AR 7 36 NEW AIR RETURN AIR VS Supply Air Fan VR Return Air Fan DEP FS Filter Pressure Switch only for new air PT1000 PROBES and Servomotors SSG Supply Air Duct Probe SDG Duct Defrost Probe SEG Exte...

Страница 8: ...Agnd 33 and AI4 35 SBD Defrost Battery Probe on Agnd 36 and AI4 37 for INFINITE BE or a 1000 Ohms resistance for FIRST and PRE MIUM GTDHR FIRST PREMIUM INFINITE ENERGY RECOVERY UNIT MS CDF 001 A Ind A...

Страница 9: ...ns mitter in case of the LOBBY EC QUATTRO EC MAC2 EC option In this case do not connect any thing to these terminals SUPPLY AND RETURN AIR MOTOR 31 32 33 34 35 36 40 41 According to De CARMA size see...

Страница 10: ...ut available if the CARMA unit is associated with the LOBBY EC option for opening the dampers during Night Cooling period see chapter VI 9 DX 2 DO7 24V output available for starting a direct expansion...

Страница 11: ...BE PREMIUM BE and INFINITE BE versions the K1 auxiliary contact is factory connected FIRST version if you install an additional BE module to the CARMA unit to be connected to the C and 2 terminals of...

Страница 12: ...CDF 001 A Ind A update 01 07 2011 Created by JC Validated by AR 12 36 CARMA 9008 SUPPLY AIR POWER CONTROL CONTROL GREEN YELLOW BLUE BROWN BLUE YELLOW GREEN YELLOW BLUE BROWN WHITE BROWN SHIELDING GREE...

Страница 13: ...INFINITE ENERGY RECOVERY UNIT MS CDF 001 A Ind A update 01 07 2011 Created by JC Validated by AR 13 36 GTDHR 9016 9023 CONTROL POWER SUPPLY AIR POWER CONTROL RETURN AIR RETURN AIR GTDHR 9035 9048 GTD...

Страница 14: ...emperature set point the water battery valve will open or the electric battery will start In summer FREE COOLING The Bypass closes when the outside temperature is higher than the inside temperature to...

Страница 15: ...n the hot water battery is already installed in the unit The Anti frost Thermo stat is connected However you should wire the 3 way valve For all other versions also connect the THA Anti frost Thermost...

Страница 16: ...lectric battery housing follow the diagram as given below VI 15 Heating electric battery CARMA PREMIUM BE and INFINITE BE In PREMIUM BE and INFINITE BE version the electric battery is already installe...

Страница 17: ...d INFINITE BC version the defrost battery is already installed in the unit The control is also connected GTDHR FIRST PREMIUM INFINITE ENERGY RECOVERY UNIT MS CDF 001 A Ind A update 01 07 2011 Created...

Страница 18: ...enus The Up and Down keys are also used to increase or decrease the value of a parameter when it is accessible whereas the Left and Right keys are also used to navigate within the same parameter The O...

Страница 19: ...to 7 Operating period Vent AS 00 0 Hours Viewing the alarm log use the bottom arrow to scroll the log Alarm report Inputs outputs Analogue inputs AI1 AS Temp supply air AI2 Ext Temp outdoor AI3 Def Te...

Страница 20: ...2 OR QUATTRO EC Actual 4178m3 h example Set point 5000m3 h 5 Frequency control AS manual vent Output 1 1 75 5 Output 1 2 50 5 CO2 CARMA DIVA EC OR QUATTRO EC Actual 654ppm example Set point 1000ppm 6...

Страница 21: ...y 3 Per 1 12 00 14 00 Per 2 18 00 00 00 Etc up to Sunday and vacations Vacations mm dd up to 24 periods 4 1 01 01 01 01 example 1 January 2 12 25 12 25 example 25 December 1 Time Date Day Setting see...

Страница 22: ...d pgr or Reduced speed pgr menu as indicated in chapter VII 2 Once on this menu press the OK key Fill in the desired value Validate by pressing the OK key to go to the next field Use the down arrow to...

Страница 23: ...the welcome screen VII 3 3 b CARMA LOBBY EC 5 chapter VII 2 You can change the constant pressure of your unit for each fan to set your flow rates To set your initial HS flow rate force the system int...

Страница 24: ...t changeable If you increase or decrease a value all the others should be increased by the same value to comply with this air relationship principle Validate by pressing the OK key to go to the next f...

Страница 25: ...to the Configuration menu For this you should get the Service level access rights Follow the procedure given below Enter the code 2222 with the help of the directional keys and then validate with the...

Страница 26: ...ll be able to enable the MODBUS and modify the PLA and ELA addresses 1 Activation of MODBUS Inactive as standard 2 PLA ELA address addressing of the regulator as standard PLA 254 ELA 254 Access rights...

Страница 27: ...on VII 3 8 c LON Communication if CORRIGO with LON option No parameter is to be set in the Corrigo you will find the required files at the following address ftp ftpserver regin se Communication 20vari...

Страница 28: ...d AR vent fault Return air fan not working A 30s 120s for LOBBY MAC2 QUAT TRO EC The pressure switch is wrongly connected the pressure switch should be set at 30Pa The motor is not working The pressur...

Страница 29: ...rror Defrost temperature probe error C 5s The defrost temperature probe SDG is not working or is wrongly wired see chapter V Supp temp regulator error Defrost battery probe error C 5s The defrost batt...

Страница 30: ...is described below A condenser is used to back up the memory and to operate the clock for about 10 minutes after the current has been dut If the battery change operation takes less than 10 minutes the...

Страница 31: ...transmitted to the external items unit and regulation Check the electrical connections every year Filtration do not damage the filtering media Classification Filtration efficiency EUROVENT Reference W...

Страница 32: ...GTDHR FIRST PREMIUM INFINITE ENERGY RECOVERY UNIT MS CDF 001 A Ind A update 01 07 2011 Created by JC Validated by AR 32 36 X NOTES Date Observations...

Страница 33: ...setting LS Factory setting HS Factory setting LS 90 80 40 MIN GTDHR FIRST PREMIUM INFINITE ENERGY RECOVERY UNIT MS CDF 001 A Ind A update 01 07 2011 Created by JC Validated by AR 33 36 Flow rate m3 h...

Страница 34: ...setting HS Factory Setting LS 80 100 40 MIN GTDHR FIRST PREMIUM INFINITE ENERGY RECOVERY UNIT MS CDF 001 A Ind A update 01 07 2011 Created by JC Validated by AR 34 36 Flow rate m3 h Static pressure p...

Страница 35: ...ing HS Factory Setting LS Factory Setting HS Factory Setting LS GTDHR FIRST PREMIUM INFINITE ENERGY RECOVERY UNIT MS CDF 001 A Ind A update 01 07 2011 Created by JC Validated by AR 35 36 Flow rate m3...

Страница 36: ...FINITE ENERGY RECOVERY UNIT MS CDF 001 A Ind A update 01 07 2011 Created by JC Validated by AR 36 36 http www airtradecentre com 90 70 60 50 40 80 Factory setting Factory setting 100 Flow rate m3 h St...

Отзывы: