INSTALLATION
Connect the CSU
The CSU can be powered by the line or from a locally provided -48 V dc
power supply. Figure 2-25 shows the connections for connecting the CSU.
The 48 V and GRD leads are optional according to how the CSU is powered.
H 6 0 0 3 0 7 , 0 2
C O N N E C T O R
CABLE (NOTE)
NOTE : FOR DISTANCES OVER 50 FEET ( 15.2 M)
USE C6E CONNECTOR CABLE(S) BETWEEN
H600 307,02 CONNECTOR CABLE AND DS1
TRUNK CIRCUIT PACK .
T O L O C A L L Y
P R O V I D E D - 4 8 V
P O W E R S U P P L Y
Figure 2-25.
CSU Connections
Line Compensation/Equalization
Determine the cable distance of the line, either to the line termination or
“phantom” midpoint of a direct connection.
Refer to the System 25
Administration Manual (555-540-650) for instructions on setting the line
e q u a l i z a t i o n .
Connect Coupled Bonding Conductor (CBC)
Each network interface (RJ48X) is associated with a service entrance
(protector block) ground. A CBC should be connected to this ground. If the
local telephone company has not run a CBC up to the network interface, you
should run it yourself. Use #12, #14, or #16 AWG wire. Start the CBC at
the protector block ground, and run it as close as possible to the facilities
cable. If possible, tie wrap the CBC to the facilities cable. Do not use spare
pairs in the telephone company cable for this purpose.
2-58
Содержание Network Adapter 25
Страница 1: ...AT T AT T System 25 Installation and Maintenance Manual 555 540 103 B November 1995 ...
Страница 18: ...APPENDIX F Administration Error Messages GLOSSARY I N D E X F 1 G 1 I 1 viii ...
Страница 29: ...INSTALLATION NOTE 9 WIDE MOUNTING CENTERS ARE 8 1 2 APART FLANGES OVERLAPPED Figure 2 1 10B ETU 2 5 ...
Страница 31: ...INSTALLATION MOUNTING CENTERS WHEN FLANGES ARE OVERLAPPED Figure 2 2 617A Panel 2 7 ...
Страница 33: ...INSTALLATION Z21OA1 ADAPTER Y ADAPTER WP90851 L1 858A ADAPTER Figure 2 3 SIP Adapters 2 9 ...
Страница 50: ...INSTALLATION Figure 2 10 Three Cabinet System Front View With Covers Removed 2 26 ...
Страница 51: ...INSTALLATION Figure 2 11 Position of Shorting Plugs on CPU Memory Circuit Pack 2 27 ...
Страница 72: ...INSTALLATION UPPER ADAPTER MOUNTING CLIP Figure 2 18 Mounting Adapters ...
Страница 85: ...INSTALLATION 2 61 ...
Страница 92: ...INSTALLATION 2 68 ...
Страница 103: ...INSTALLATION Figure 2 32 10B Emergency Transfer Unit 2 78 ...
Страница 104: ...INSTALLATION Figure 2 33 Emergency Transfer Unit Connections 2 79 ...
Страница 109: ...INSTALLATION Figure 2 35 Attendant Console With DXS Console 2 84 ...
Страница 146: ...INSTALLATION 2 119b This page intentionally left blank November 1995 ...
Страница 153: ...INSTALLATION This page intentionally left blank 2 124b November 1995 ...
Страница 156: ...Figure 2 57 278A Adaptor Plug Positions for Connecting TN763 Circuit Pack to Paging System 2 127 ...
Страница 223: ...MAINTENANCE Figure 4 2 Clearing Supply Troubles Sheet 1 of 2 4 47 ...
Страница 224: ...MAINTENANCE Figure 4 2 Clearing Power Supply Troubles Sheet 2 of 2 ...
Страница 225: ...MAINTENANCE Figure 4 3 Clearing CO Trunk Troubles 4 49 ...
Страница 226: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 1 of 4 4 50 ...
Страница 227: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 2 of 4 4 51 ...
Страница 228: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 3 of 4 4 52 ...
Страница 229: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 4 of 4 4 53 ...
Страница 231: ...Figure 4 6 Clearing Tie Trunk Troubles Sheet 1 of 5 4 55 ...
Страница 232: ...MAINTENANCE 6 7 8 9 10 Figure 4 6 Clearing Tie Trunk Troubles Sheet 2 of 5 4 56 ...
Страница 233: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 3 of 5 4 57 ...
Страница 234: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 4 of 5 4 58 ...
Страница 235: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 5 of 5 4 59 ...
Страница 236: ...MAINTENANCE Figure 4 7 Clearing Paging Equipment Troubles ...
Страница 250: ...MAINTENANCE Figure 4 9 System Cabinet Backplane Wiring Side Sheet 2 of 2 4 74 ...
Страница 251: ...MAINTENANCE Figure 4 10 TDM Signal Designations on Cabinet Backplane 4 75 ...
Страница 252: ...MAINTENANCE Figure 4 11 Power Designations on Cabinet Backplane 4 76 ...
Страница 263: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 1 of 3 ...
Страница 264: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 2 of 3 4 87 ...
Страница 265: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 3 of 3 4 88 ...
Страница 271: ...MAINTENANCE Figure 4 13 Clearing Switched Loop Attendant Console Troubles Sheet 1 of 5 ...
Страница 272: ...MAINTENANCE 4 13 Clearing Switched Loop 2 of 5 Console Troubles Sheet 4 95 ...
Страница 273: ...MAINTENANCE Figure 4 13 Clearing Switched 3 of 5 Loop Attendant Console Troubles Sheet 4 96 ...
Страница 274: ...MAINTENANCE 4 13 Clearing Switched 4 of 5 Console Troubles 4 97 ...
Страница 305: ...APPENDIX C System Additions or Changes Figure C 1 Typical System 25 Port Circuit Pack C 4 November 1995 ...
Страница 321: ...APPENDIX E Administration Codes and Data This page is intentionally blank E 2 b ...
Страница 341: ...APPENDIX E Administration Codes and Data Table E J MET Set Button Defaults Cannot be changed E 22 ...