INSTALLATION
Install TAE, 617A Panels, and Fanning Strips
To install this equipment, proceed as follows:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
For each RJ21X, RJ2GX, and RJ48X
700A Jack 1/2-inch from the edge of
switch cabinet(s).
Mount the first 617A Panel.
network interface, install one
the backboard closest to the
Position and mount the first 50A Fanning Strip next to the 617A
Panel. The edges should overlap so that the same screws will go
through the overlapping key slots in the 50A Fanning Strip and the
617A Panel. The bottoms of the fanning strip and panel are flush.
If required, mount a second 50A Fanning Strip above the first.
Mount the first 10B Emergency Transfer Unit (ETU) in the position
shown in Figure 2-16 or Figure 2-17. Overlap the edges of the ETU
and the panel so that the same screws will go through the
overlapped key slots.
Mount the remaining 617A Panels. Overlap the panels to conserve
space and to reduce the number of screws required; however, do
not mount more than three panels on either side of the 50A Fanning
Strip.
If required, install the second ETU above the first.
If additional ETUs are required, install them close to the 700A Jacks
(Figure 2-1 6). If the alternate SIP arrangement (Figure
install additional ETUs above the second ETU.
Using a felt-tipped pen, letter the adapter columns (A
the 617A Panels, starting with the left side. For
arrangement, start with the left side on the lower row.
Using a #12 AWG ground wire, connect the ground
2-17) is used,
through J) on
the alternate
points on the
ETUs (screw terminal on the upper left side) and link them to the
single-point ground.
Install D rings as required below the 700A Jacks and 617A Panels.
2-44
Содержание Network Adapter 25
Страница 1: ...AT T AT T System 25 Installation and Maintenance Manual 555 540 103 B November 1995 ...
Страница 18: ...APPENDIX F Administration Error Messages GLOSSARY I N D E X F 1 G 1 I 1 viii ...
Страница 29: ...INSTALLATION NOTE 9 WIDE MOUNTING CENTERS ARE 8 1 2 APART FLANGES OVERLAPPED Figure 2 1 10B ETU 2 5 ...
Страница 31: ...INSTALLATION MOUNTING CENTERS WHEN FLANGES ARE OVERLAPPED Figure 2 2 617A Panel 2 7 ...
Страница 33: ...INSTALLATION Z21OA1 ADAPTER Y ADAPTER WP90851 L1 858A ADAPTER Figure 2 3 SIP Adapters 2 9 ...
Страница 50: ...INSTALLATION Figure 2 10 Three Cabinet System Front View With Covers Removed 2 26 ...
Страница 51: ...INSTALLATION Figure 2 11 Position of Shorting Plugs on CPU Memory Circuit Pack 2 27 ...
Страница 72: ...INSTALLATION UPPER ADAPTER MOUNTING CLIP Figure 2 18 Mounting Adapters ...
Страница 85: ...INSTALLATION 2 61 ...
Страница 92: ...INSTALLATION 2 68 ...
Страница 103: ...INSTALLATION Figure 2 32 10B Emergency Transfer Unit 2 78 ...
Страница 104: ...INSTALLATION Figure 2 33 Emergency Transfer Unit Connections 2 79 ...
Страница 109: ...INSTALLATION Figure 2 35 Attendant Console With DXS Console 2 84 ...
Страница 146: ...INSTALLATION 2 119b This page intentionally left blank November 1995 ...
Страница 153: ...INSTALLATION This page intentionally left blank 2 124b November 1995 ...
Страница 156: ...Figure 2 57 278A Adaptor Plug Positions for Connecting TN763 Circuit Pack to Paging System 2 127 ...
Страница 223: ...MAINTENANCE Figure 4 2 Clearing Supply Troubles Sheet 1 of 2 4 47 ...
Страница 224: ...MAINTENANCE Figure 4 2 Clearing Power Supply Troubles Sheet 2 of 2 ...
Страница 225: ...MAINTENANCE Figure 4 3 Clearing CO Trunk Troubles 4 49 ...
Страница 226: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 1 of 4 4 50 ...
Страница 227: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 2 of 4 4 51 ...
Страница 228: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 3 of 4 4 52 ...
Страница 229: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 4 of 4 4 53 ...
Страница 231: ...Figure 4 6 Clearing Tie Trunk Troubles Sheet 1 of 5 4 55 ...
Страница 232: ...MAINTENANCE 6 7 8 9 10 Figure 4 6 Clearing Tie Trunk Troubles Sheet 2 of 5 4 56 ...
Страница 233: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 3 of 5 4 57 ...
Страница 234: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 4 of 5 4 58 ...
Страница 235: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 5 of 5 4 59 ...
Страница 236: ...MAINTENANCE Figure 4 7 Clearing Paging Equipment Troubles ...
Страница 250: ...MAINTENANCE Figure 4 9 System Cabinet Backplane Wiring Side Sheet 2 of 2 4 74 ...
Страница 251: ...MAINTENANCE Figure 4 10 TDM Signal Designations on Cabinet Backplane 4 75 ...
Страница 252: ...MAINTENANCE Figure 4 11 Power Designations on Cabinet Backplane 4 76 ...
Страница 263: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 1 of 3 ...
Страница 264: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 2 of 3 4 87 ...
Страница 265: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 3 of 3 4 88 ...
Страница 271: ...MAINTENANCE Figure 4 13 Clearing Switched Loop Attendant Console Troubles Sheet 1 of 5 ...
Страница 272: ...MAINTENANCE 4 13 Clearing Switched Loop 2 of 5 Console Troubles Sheet 4 95 ...
Страница 273: ...MAINTENANCE Figure 4 13 Clearing Switched 3 of 5 Loop Attendant Console Troubles Sheet 4 96 ...
Страница 274: ...MAINTENANCE 4 13 Clearing Switched 4 of 5 Console Troubles 4 97 ...
Страница 305: ...APPENDIX C System Additions or Changes Figure C 1 Typical System 25 Port Circuit Pack C 4 November 1995 ...
Страница 321: ...APPENDIX E Administration Codes and Data This page is intentionally blank E 2 b ...
Страница 341: ...APPENDIX E Administration Codes and Data Table E J MET Set Button Defaults Cannot be changed E 22 ...