Completing Installation
At this point, all of the hardware and software components of the
AUDIX Voice Power system are installed. However, the AUDIX Voice
Power system is not operational until AUDIX Voice Power and the switch
are administered. This administration is the responsibility of the customer.
The following administrative tasks must be performed on the
AUDIX Voice Power system:
•
•
•
•
•
•
•
System Parameter Administration
Subscriber Administration
Service Assignment
Channel to phone mapping (System 75 only)
Service Administrator Registration
Auto Attendant Administration
Outcalling Administration
These administrative tasks are detailed in the AUDIX Voice Power System
Manager’s Guide.
The following administrative tasks must be performed on the System 25
(with or without IS-II) or System 75/DEFINITY switch:
S y s t e m 2 5
S y s t e m 7 5
Class of Service
Class of Restriction
Port Administration
DCP Administration
DGC Groups
Hunt Groups
Assigning Extensions
Extension Administration
These administrative tasks are detailed in the AT&T System 25 R3
Administration Manual, the AT&T System 25 R3 Advanced Administration
Software User Guide (UNIX-6386) or the appropriate System 75/Definity
documentation.
Software Installation
3-21
Содержание 6386 WGS
Страница 1: ...AT T 999 500 355 Issue 1 July 1990 AUDIX Voice Power Installation and Maintenance Guide...
Страница 14: ......
Страница 37: ...FIGURE 2 19 Location of Memory SIMM Sockets on 6386 25 WGS Hardware Installation 2 23...
Страница 54: ...FIGURE 2 30 VDC600 Switch and Jumper Locations and Settings 2 40 Hardware Installation and Maintenance...
Страница 61: ...FIGURE 2 38 6386E 33 WGS System Module Back Panel Hardware Installation 2 47...
Страница 112: ......
Страница 124: ......
Страница 134: ......
Страница 205: ......
Страница 209: ......