
Rubber Track Loader
10. Undercarriage Disassembly and Assembly
10-5
Figure 10-16
Figure 10-17
Sprocket Roller Replacement
1.
Remove and replace the sprocket roller bolts.
2.
The steel pin that the roller pivots on is hardened
steel, and may not need to be replaced at the same
time as the roller.
Sprocket Removal and
Installation
The tools required for sprocket removal and
installation are listed in Table 0-1. Use
manufacturer-recommended tools whenever
possible.
Table 0-1
Required Tools
Socket Wrench
Combination Wrench
Sprocket Removal
1.
Remove the 7 bolts that fasten the bearing plate
to the drive table.
Figure 10-18
Drive Sprocket
Roller
Steel Pin
Sprocket
Roller Bolt
Содержание RC-100
Страница 2: ......
Страница 10: ......
Страница 12: ......
Страница 14: ...Rubber Track Loader 3 System Diagrams 3 2 Auxiliary Circuit System Figure 3 2 RC 100 Auxiliary Circuit System ...
Страница 15: ...Rubber Track Loader 3 System Diagrams 3 3 Drive Loop System Figure 3 3 RC 100 Drive Loop System ...
Страница 16: ...Rubber Track Loader 3 Systems Diagrams 3 4 Loader Valve Figure 3 4 RC 100 Loader Valve ...
Страница 30: ......
Страница 36: ......
Страница 46: ......
Страница 56: ......
Страница 68: ...Terex Construction Americas 8800 Rostin Road Southaven MS 38671 888 201 6008 662 393 1800 www terex com ...