
Rubber Track Loader
8. Loader/Transmission Controls Disassembly and Assembly
8-2
! WARNING !
Lower all attachments and make sure the oil is cool
before removing any components or lines. Hot oil can
cause personal injury.
1.
Lower the lift arms to the ground.
2.
Turn the engine switch to the OFF position, and
disconnect the battery.
3.
Remove the throttle linkage from the throttle
handle.
Figure 8-1
Figure 8-2
Figure 8-3
4.
Remove mounting screws from the plastic
console.
Figure 8-4
Figure 8-5
Содержание RC-100
Страница 2: ......
Страница 10: ......
Страница 12: ......
Страница 14: ...Rubber Track Loader 3 System Diagrams 3 2 Auxiliary Circuit System Figure 3 2 RC 100 Auxiliary Circuit System ...
Страница 15: ...Rubber Track Loader 3 System Diagrams 3 3 Drive Loop System Figure 3 3 RC 100 Drive Loop System ...
Страница 16: ...Rubber Track Loader 3 Systems Diagrams 3 4 Loader Valve Figure 3 4 RC 100 Loader Valve ...
Страница 30: ......
Страница 36: ......
Страница 46: ......
Страница 56: ......
Страница 68: ...Terex Construction Americas 8800 Rostin Road Southaven MS 38671 888 201 6008 662 393 1800 www terex com ...