27
OPERATION
Operation Techniques
Leveling
Steps: (see illustration)
1.
Moving forward, raise the lift arms as you tilt the bucket slowly
forward to evenly spread the material out over the ground.
2.
Once the load is released, tilt the bucket forward to an angle
45° or less to the ground.
3.
Lower the lift arms until the cutting edge rests on the ground.
4.
Engage the float function and back the machine over the materi-
al varying bucket angle slightly as necessary to maintain grade.
Loading
Steps: (see illustration)
1.
Engage the self level (bucket positioning) function, then raise
the lift arms upward until the bottom of the bucket clears the side
of the truck bed or trailer.
2.
Once clear, drive the machine forward until the pivot point of the
bucket clears the bed side.
3.
Tilt the bucket forward until all of the material has been
released into the bed.
Note:
It may be necessary to quickly tilt and curl the bucket while
releasing material into the truck bed to evenly distribute the material
within the bed.
Содержание PT-80
Страница 6: ...5 ...
Страница 14: ...13 ...
Страница 32: ...31 ...
Страница 68: ...SERVICE LOG 67 Hours Service Performed Notes ...
Страница 69: ...SERVICE LOG 68 Hours Service Performed Notes ...
Страница 70: ...SERVICE LOG 69 Hours Service Performed Notes ...
Страница 71: ...SERVICE LOG 70 Hours Service Performed Notes ...