26
Filling The Bucket
Steps: (see illustration)
1.
Lower the lift arms until they rest on the frame.
2.
Tilt the bucket slowly forward until the cutting edge engages
the ground.
3.
Drive the machine forward until the bucket is full of material.
4.
Curl the bucket and raise the lift arms simultaneously to
break the load free from the pile.
5.
Maneuver the machine clear of the pile and then lower the lift
arms, keeping the bucket curled upward, to approximately 10-
12” above the ground for transporting.
Grading
Steps: (see illustration)
1.
Lower the lift arms until they rest on the frame.
2.
Tilt the bucket slowly forward until the cutting edge engages
the ground.
3.
Drive the machine forward making slight bucket angle adjust-
ments to vary cut depth as necessary.
4.
When full, curl the bucket and raise the lift arms simultaneously.
Once clear, lower them to approximately 10-12” above the
ground for transporting.
OPERATION
Operation Techniques
Do not push or pull dirt as done in digging, grading, or leveling oper-
ations with the bucket tilted fully forward into the “Dump” position.
This will stress the bucket cylinders and may damage them.
CAUTION
Содержание PT-80
Страница 6: ...5 ...
Страница 14: ...13 ...
Страница 32: ...31 ...
Страница 68: ...SERVICE LOG 67 Hours Service Performed Notes ...
Страница 69: ...SERVICE LOG 68 Hours Service Performed Notes ...
Страница 70: ...SERVICE LOG 69 Hours Service Performed Notes ...
Страница 71: ...SERVICE LOG 70 Hours Service Performed Notes ...