GENERAL POWER
VOLTAGE (V)
SECTION (mm
2
)
40 mts. max.
Nº OF WIRES
ALASKA SIBERIA
EF-4
220 II
2,5
2,5
2 + GROUND
EF-6
4
EF-4
380 III
220 III
2,5
4 + GROUND
EF-6
EF-8
EF-10
EF-12
EF-15
EF-17
Regulator and ON / OFF switch are placed inside the cooler with axial fan; for access front cover
of the equipment must be removed.
The electrical installation should be done by qualified professionals, keeping in mind the following
points:
Perform electrical connections following present manual indications.
Place a U-curve thermal-magnetic circuit breaker in the general power connection to protect
the line in case of a short in the circuit.
Place a differential circuit breaker in the general power connection to protect the equipment
from possible ground problems. The differential breaker should be minimum 30mA.
Before installing the connections are sure to disconnect the electricity so that the power supply
is turned off.
Connect the power supply wires to the machines input terminals.
Connect the grounding wire to its corresponding terminal.
IMPORTANT
:
Cooler Air-Water EF shall never operate without the simultaneous
operation of the purifier pump. Special careful should be taken at the time of interconnecting
timers or programmers that may stop the purification pump, leaving the cooler running.
All local and national electric regulations concerning protection against defects in electric
power lines should be respected at all times during installation.
Verify the torque of all electrical connections.
REGULATOR