Important: The attachment rail is the main load bearing fixing; it is vital that it is 

secured correctly.

          

Measure 100mm up from the floor along the centre-line of the final position of the unit; using a 

spirit level, draw a horizontal line, either side of the centre line, at least 50mm long.

Centre of fixing holes

1200mm above Floor

Place the attachment rail with the open lip upwards, on the line . With a pencil mark two of the 

holes for the rail at least 50mm apart.

Using a 6mm masonry bit, drill two full depth pilot holes at the marked positions and then open 

up in order to accept the anchor fixings. 

Fix the attachment rail, with the open lip uppermost onto the wall using two suitable fixings. 

Ensure that the rail is level using a spirit level (adjust to suit) and check that it is secure.

With assistance, place the rise and fall unit onto the wall ensuring that the two short rails welded 

to the unit engage with the one on the wall. 

Ensure that the unit is level, then mark the wall through the remaining three attachment points, 

two on the lower horizontal beam and one on the upper horizontal beam.

Remove the unit from the wall and at the three marked positions drill three 6mm full-depth pilot 

holes.

Open the two to accept Anchor fixings. Open the upper hole to 10mm to accept a plastic wall 

plug.

Fit the fixings and the plug into the wall. 

Place the rise and fall unit back onto the wall-mounted rail. Fully fix the rise and fall unit to the 

wall using suitable fixings.

Ensure that the mains supply to the junction box on the wall is switched OFF.

Electrically connect the rise and fall unit to the fused outlet behind the unit using the three-core 

cable supplied. Ensure there is sufficient cable to allow the unit to rise and fall.

Ensure the handset is fitted 

BEFORE

 switching the power on.

Switch on the mains voltage, a light fitted next to the Handset socket on the right hand side of 

the unit, should be illuminated.

Please Note: Due to the complexity of different building methods Astor 

Bannerman do not supply installation fixings and anchors.

Содержание ABW6

Страница 1: ...Warranty No Height Adjustable Basin ABW6 OWNERS MANUAL INSTALLATION GUIDE ...

Страница 2: ...ould be facing forward towards the user when off To operate them rotate the levers outwards to achieve the flow rate required To stop water flowing rotate the levers until they are facing forward once again Operating the touch tap system The taps are usually set as wave ON Wave OFF To turn the water ON OFF pass your hand above the Sensor on the basin top Touch Tap Sensors in position ...

Страница 3: ... unit Examine the mains fuses circuit breakers and reset as necessary and ensure that mains voltage is fully reconnected then press the reset button situated next to the handset connector If the LED fails to illuminate an electrician needs to ensure that mains electrical supply is available at the fused spur a fuse may have blown elsewhere in the circuit Fault The rise and fall unit travels upward...

Страница 4: ...ble waste assembly including waste plug 1 x three hole mixer tap system 2 x 95mm long 15mm copper pipe 2 x 45mm long 15mm copper pipe 2 x compression elbow 15mm 2 x 15mm straight couplings 2 x 1 2 x 15mm Tap adaptors 2 x lever tap handles 2 x long braided hoses 2 x fibre washers 2 x screen filter seals 1 x 470mm lipped attachment rail 1 x grey 2 button handset 6 x white plastic rivets 1 x mirror 1...

Страница 5: ...equired with flush mounted a flex outlet cover on the wall behind the unit at a height of 1100mm from the floor on the centreline of the unit Fixing The basin assembly should be fixed to a load bearing wall i e strong enough to carry a 100kg load on wall fixing which is flat and free from obstruction from 200mm 2200mm above the floor If the basin needs to be fixed to a stud wall the wall will need specia...

Страница 6: ...ith the one on the wall Ensure that the unit is level then mark the wall through the remaining three attachment points two on the lower horizontal beam and one on the upper horizontal beam Remove the unit from the wall and at the three marked positions drill three 6mm full depth pilot holes Open the two to accept Anchor fixings Open the upper hole to 10mm to accept a plastic wall plug Fit the fixi...

Страница 7: ...ke sure the rod can move freely Using the adjusting screw set the overall length of the basin plug to 77mm Stand the lower cover in place Fit the plug lifting rods in position and set the clamp to lift the plug Touch taps Fit the sensors before mounting the unit on the wall Touch tap sensors should be fitted in the position agreed with the client Drill an 18mm in the position required take care to...

Страница 8: ... brass nut Test the water supply Ensure the isolation valves are CLOSED Place a bucket or suitable container below the plug hole of the basin Open both basin taps fully and then slowly open each of the isolation valves wait 2 minutes then examine the supply system for leaks correct as necessary Close the isolation valves Fit the white plastic lower cover Remove the mushroom heads from the plastic ...

Страница 9: ... supply hoses need to be enclosed within the white self adhesive trunking supplied Using the handset raise the assembly to its highest position Remove the capping from the front of the trunking Remove the protective film from the self adhesive tape fitted to the rear of the trunking Pass the trunking behind the hot and cold supply hoses taking care to ensure that the self adhesive tape is kept awa...

Страница 10: ...Page 10 Version 3 01 04 2016 ...

Страница 11: ...Page 11 Version 3 01 04 2016 ...

Страница 12: ...821110 Technical Helpline 01242 822972 2013 Astor Bannerman Medical Limited Our policy is one of continuous development and we therefore reserve the right to make technical alterations without notice The content of this publication may not be copied either whole or in part without the consent of Astor Bannerman Medical Limited Original Document ...

Отзывы: