Mark the Top Rail Location
ATTENTION:
A minimum of two people are required for the next assembly steps.
Preassembly the top rail onto the fixed glass to locate the mounting points on the
wall relative to your desired location.
Painters tape or masking tape in the general location of the of the final installation
will aid in marking the wall and floor.
1
...
---0
.,,.------
-----iTI-o ---,
9
Содержание Moselle SDR976
Страница 1: ...MOSELLE SDR976...
Страница 18: ...Installing the door seals Install the door seals according to the drawing 17...
Страница 25: ...Notes 24...
Страница 26: ...Notes 25...