12 1-800-810-WIRE • www.sargentlock.com • A7855C
Copyright © 2014, Sargent Manufacturing Company
, an ASSA ABLOY Group company
. All rights reser
ved.
Reproductions in whole or in part without express written permission of Sargent Manufacturing Company is prohibited.
01/31/14
Profile Series v.G1.5/LK Mortise Lock
Step #10 – Attach Front Plate
Attach front plate with (2) flat head screws.
Step #11 – Attach Battery Keeper and Cover
1. Secure the inside escutcheon using two #8-32 screws through top and
bottom of the escutcheon (Fig. 11A). Thread into outside escutcheon.
Note: For RF Technology versions (G1-TU, G1-TP, G1-TA),
refer to “RF Technology Lock” section on page 14
to install through-bolt screws.
2. Straighten escutcheons and tighten securely,
being careful to avoid pinching wires.
3. Attach inside cover to escutcheon
making sure to line up tabs with
retaining slots in cover.
4. Secure with security screw
using security tool (P/N 01-0297)
provided (Fig. 11A).
Inside of door
Fig. 11A
Battery Keeper
Battery
Cover
Security
Screw
Security Tool
01-0297
(Included)
#8-32
Screws
#8-32
Screws
Fig. 10A
Front Plate
(2) Flat Head Screws
Lock Body Screws
Outside
of Door