DANS01 – Installation Guide
Issue: 02 complete, approved
Page 8 of 12
12.
Connect the field wiring; see
Figure 5
DANS01 field wiring connection
!
!
FIELD WIRING TO
ROUTER AND RACK
Gland and cable entry point shown
as example only.
TO FRONT PANEL PCB
The cable screen
should be terminated
to the brass terminal.
13.
Reconnect any disconnected wiring and front panel tethers.
Refer to step
) for disconnected wiring and tethers.
Refer to Section “
(page
for connection details, if required.
14.
Power the DANS01 on from the central equipment rack.
The LED on the front panel illuminates to indicate that the unit is powered.
15.
Secure the front panel by screwing it tight to provide an IP65 seal, but not excessively tight so that
any of the fixing threads are stressed, as this may cause them to weaken and shear.
16.
The installation is complete.
17.
Commission the DANS01.
Refer to Section
“
(page