2.1
Overview
The first steps in applying the ADR141A/ ADR241A Feeder Protection Relay are installing
and connecting the relay. This section describes common installation features and
requirements.
To install and connect the relay safely and effectively, user must be familiar with relay
configuration features and options. User should carefully plan relay placement, cable
connections, and relay communication.
This section contains drawings of typical ac and dc connections to the ADR141A/ ADR241A.
Use these drawings as a starting point for planning your particular relay application.
2.2
Handling
2.2.1
Handling the Goods
Our products are of robust construction but require careful treatment before installation on
site. This section discusses the requirements for receiving and unpacking the goods, as well
as associated considerations regarding product care and personal safety.
Caution: Before lifting or moving the equipment, user should be familiar
with the Safety Information chapter of this manual.
2.2.2
Receipt of the Goods
On receipt, ensure the correct product has been delivered. Unpack the product immediately
to ensure there has been no external damage in transit. If the product has been damaged,
make a claim to the transport contractor and notify ASHIDA promptly.
For products not intended for immediate installation, repack them in their original delivery
packing.
2.2.3
Unpacking the Goods
When unpacking and installing the product, take care not to damage any parts and make
sure that additional components are not accidentally left in the packing or lost. Do not discard
any CDROMs or technical documentation. These should accompany the unit to its
designated substation and kept in a dedicated place.
The site should be well lit to aid inspection, clean, dry and reasonably free from dust and
excessive vibration. This particularly applies where installation is being carried out at the
same time as construction work.
Содержание ADR141A
Страница 10: ...Page intentionally Left Blank...
Страница 16: ...Page intentionally Left Blank...
Страница 28: ...Page intentionally Left Blank...
Страница 43: ...Page intentionally Left Blank...
Страница 53: ...Page intentionally Left Blank...
Страница 69: ...Page intentionally Left Blank...
Страница 73: ...Page intentionally Left Blank...
Страница 74: ...ADR141A ADR241A Doc ID ADR241A_IM_01 Ref ID ADR241A IM SS Rev No 02 Page No 74 of 150 Section 6 Setting Sheet...
Страница 80: ...Page intentionally Left Blank...
Страница 92: ...Page intentionally Left Blank...
Страница 93: ...ADR141A ADR241A Doc ID ADR241A_IM_01 Ref ID ADR241A IM UG Rev No 02 Page No 93 of 150 Section 8 User Guide...
Страница 122: ...Page intentionally Left Blank...
Страница 123: ...ADR141A ADR241A Doc ID ADR241A_IM_01 Ref ID ADR241A IM FC Rev No 02 Page No 123 of 150 Section 9 Flow Chart...
Страница 136: ...Page intentionally Left Blank...
Страница 140: ...ADR141A ADR241A Doc ID ADR241A_IM_01 Ref ID ADR241A IM DR Rev No 02 Page No 140 of 150...
Страница 141: ...Page intentionally Left Blank...
Страница 151: ......