EN
15
ASIN AQUA Net Installation Test
WARNING:
Any obstacles, bubbles or leaks in the connecting tube will prevent
ASIN AQUA Net from correct operating. The clear plastic tube allows you to
monitor fl ow of liquid to the injecting valves.
Before commencing the operation, test ASIN AQUA Net installation. Most
problems result from incorrectly performed installation.
Test
In the “Test of Outputs” menu, gradually start all the pumps and while they are
running, check tightness of all the PE tube connections. Check the injecting
valves for blockage and air bubbles in the PE tube.
DO NOT FORGET! Provide the testing run and stop of all accessories
connected to ASIN AQUA Net. At this step just test, do not dose the aids
or provide the initial dose of chemicals!
1.
2.
3.
Check tightness of all the
connections.
Liquid must reach spraying and
subsequently the tube.
If bubbles occur here, the
pump draws air in. Repair the
connection - disconnect the
tube, cut the end carefully in
90° angle and plug it back.
Monitor level in the
transparent plastic tube.
Содержание ASIN AQUA NET CLF
Страница 1: ...www asekopool com ASIN AQUA NET CLF REDOX DOSE EN USER S MANUAL ...
Страница 6: ...EN 6 ASIN AQUA Net ASIN AQUA NET CLF 12001 ASIN AQUA NET Redox 12144 ASIN AQUA NET Dose 12022 ...
Страница 13: ...EN 13 Max 8 m Max 8 m Max 8 m TO POOL Heating FROM POOL Besgo Max 2 m Koagulations mixer Koagulations mixer ...
Страница 33: ...EN 33 ...
Страница 34: ...EN 34 ...
Страница 35: ...EN 35 ...
Страница 36: ...www asekopool com ASIN AQUA Net USER S MANUAL EN ...