CZ
14
PP60 pH maintenance
To ensure the optimum effi ciency, perform visual checks and maintenance
of PP60 pH on a regular basis.
Pump Hose Replacement
To prevent the pump from failing, it is recommended to replace the hose
#12073 every 24 months.
In doing so, proceed as follows:
•
Switch off PP60 pH.
•
Turn the pump cover cassette counterclockwise and take it out of
PP60 pH.
•
Release both hose ends and take it out of the cassette.
•
Lubricate the new hose with the supplied special grease.
•
Insert the lubricated hose into the cassette.
•
Place the cover cassette back on PP60 pH and turn it clockwise to lock it.
•
Use new nuts, which are part of the replacement hose set, for connection
of the PE tube.
Injection Valve Maintenance
On a regular basis, check throughput of the injection valves, rubber band
integrity, remove scale.
In case of private pools, replace injection valve rubber bands every 2 years.
In case of public pools, replace injection valve rubber bands every year.
#12073 Replacement tube kit for PP 60
#12005 Injection valve
#13087 Injection valve rubber
Содержание 13260
Страница 1: ...USER S MANUAL PP60 pH EN PERISTLATIC PUMP FOR pH REGULATION www asekopool com...
Страница 11: ...CZ 11 Max 8 m Max 8 m Max 2 m TO POOL Heating FROM POOL Besgo Coagulation mixer Sampling point for callibration...
Страница 15: ...CZ 15...
Страница 16: ...www asekopool com PP60 pH USER S MANUAL EN...