4.
Welding parameter set-up UF2000/1
Quick Review
Press
(+) (-)
simultaneously
UF - I
Tool name is displayed
<Mat>
Select material to be welded
<dia>
Select the outside diameter (mm)
<wth>
Wall thickness of material welded
<temp>
Temperature of the heating element
BS:
Non-Contact
Butt-Fusion
HS:
Conventional
Butt-Fusion
IS
:
Tekweld Butt-Fusion
<proj no>
Any 4 digits
<joint no>
automatic count
<time/date>
set time and date
Welding parameters by material, diameter and wall thickness are on page 6. Also enclosed is a cut
sheet which can be checked off and attached to each tool.
5.
Welding method UF2000/1
Quick Review
<pl>
Planing
<al>
Alignment
<t(A)>
Increase pressure against heating element
<t(Aw)>
Heat soak time, the heating time
pipe
together.
<t(U)>
Adjustment time, Time allowed to remove HE and bring
pipe
together.
<t(F)>
Joining Pressure and ramp-up time
<t(K)>
Cooling Time
Asahi/America, Inc.
UF 2000/1
Page 5 of 1
8