5.2
On-site requirements
The telescope will be delivered in wooden crates. Store them in a dry environment protected from weather.
Do not unpack any items of your telescope without the presence of ASA staff.
For the initial installation the following things have to be provided by the customer:
•
Stable Internet connection completely accessible for ASA stuff during the whole installation process
min. data rates: 5Mbit/s download, 500kbit/s upload
available port on your local Ethernet switch
•
Operator computer: a simple office PC is sufficient
•
110/230VAC power socket
•
Appropriate concrete foundation (see chapter
Requirements of concrete foundation
•
Crane: Consider the telescope weight (see chapter
), height and lifting distance
required to lift the telescope into your observatory.
•
Road to observatory has to be negotiable for trucks
•
Electric drill with SDS-plus chuck
•
appropriate vacuum cleaner for cleaning the drill holes